15%峰值负荷光伏互联屏技术评价

M. Reno, R. Broderick
{"title":"15%峰值负荷光伏互联屏技术评价","authors":"M. Reno, R. Broderick","doi":"10.1109/PVSC.2015.7356168","DOIUrl":null,"url":null,"abstract":"Most utilities use a standard small generator interconnection procedure (SGIP) process that includes a screen for placing potential PV interconnection requests on a fast track that do not require more detailed study. One common screening threshold is the 15% of peak load screen that fast tracks PV below a certain size. This paper performs a technical evaluation of the screen compared to a large number of simulation results for PV on 40 different feeders. Three error metrics are developed to quantify the accuracy of the screen for identifying interconnections that would cause problems or incorrectly sending a large number of allowable systems for more detailed study.","PeriodicalId":427842,"journal":{"name":"2015 IEEE 42nd Photovoltaic Specialist Conference (PVSC)","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"Technical evaluation of the 15% of peak load PV interconnection screen\",\"authors\":\"M. Reno, R. Broderick\",\"doi\":\"10.1109/PVSC.2015.7356168\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Most utilities use a standard small generator interconnection procedure (SGIP) process that includes a screen for placing potential PV interconnection requests on a fast track that do not require more detailed study. One common screening threshold is the 15% of peak load screen that fast tracks PV below a certain size. This paper performs a technical evaluation of the screen compared to a large number of simulation results for PV on 40 different feeders. Three error metrics are developed to quantify the accuracy of the screen for identifying interconnections that would cause problems or incorrectly sending a large number of allowable systems for more detailed study.\",\"PeriodicalId\":427842,\"journal\":{\"name\":\"2015 IEEE 42nd Photovoltaic Specialist Conference (PVSC)\",\"volume\":\"25 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-06-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 IEEE 42nd Photovoltaic Specialist Conference (PVSC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PVSC.2015.7356168\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE 42nd Photovoltaic Specialist Conference (PVSC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PVSC.2015.7356168","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

摘要

大多数公用事业公司使用标准的小型发电机互连程序(SGIP)流程,其中包括一个屏幕,用于将潜在的光伏互连请求置于快速通道上,而不需要更详细的研究。一个常见的筛选阈值是峰值负载的15%筛选,它可以快速跟踪低于一定尺寸的PV。本文对该筛网进行了技术评价,并与40条不同馈线上PV的大量模拟结果进行了比较。开发了三个误差度量来量化屏幕的准确性,以识别可能导致问题的互连或错误地发送大量允许的系统以进行更详细的研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Technical evaluation of the 15% of peak load PV interconnection screen
Most utilities use a standard small generator interconnection procedure (SGIP) process that includes a screen for placing potential PV interconnection requests on a fast track that do not require more detailed study. One common screening threshold is the 15% of peak load screen that fast tracks PV below a certain size. This paper performs a technical evaluation of the screen compared to a large number of simulation results for PV on 40 different feeders. Three error metrics are developed to quantify the accuracy of the screen for identifying interconnections that would cause problems or incorrectly sending a large number of allowable systems for more detailed study.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信