应用8D报告提高生产过程中争议程序的有效性

A. Pacana, K. Czerwińska
{"title":"应用8D报告提高生产过程中争议程序的有效性","authors":"A. Pacana, K. Czerwińska","doi":"10.2478/cqpi-2020-0019","DOIUrl":null,"url":null,"abstract":"Abstract The aim of the study is to use the 8D methodology to solve the production problem, which was the incorrect installation of the rings in the piston designed for excavators. The idea of the method used is to correctly identify the causes of the problem and implement corrective actions to prevent recurrence of the problem. In order to detect as many potential causes of non-compliance as possible, the working team conducted brainstorming sessions and then developed the Ishikawa diagram. Team members found that the most common source of the problem was human error. In order to eliminate it, it was decided to carry out a series of training courses and to additionally equip assembly stations. The presented methodology of solving quality problems can be implied in every production company.","PeriodicalId":166707,"journal":{"name":"Conference Quality Production Improvement – CQPI","volume":"18 4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Improving the Effectiveness of Proceedings with Disagreements in a Production Process with Applying of Report 8D\",\"authors\":\"A. Pacana, K. Czerwińska\",\"doi\":\"10.2478/cqpi-2020-0019\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The aim of the study is to use the 8D methodology to solve the production problem, which was the incorrect installation of the rings in the piston designed for excavators. The idea of the method used is to correctly identify the causes of the problem and implement corrective actions to prevent recurrence of the problem. In order to detect as many potential causes of non-compliance as possible, the working team conducted brainstorming sessions and then developed the Ishikawa diagram. Team members found that the most common source of the problem was human error. In order to eliminate it, it was decided to carry out a series of training courses and to additionally equip assembly stations. The presented methodology of solving quality problems can be implied in every production company.\",\"PeriodicalId\":166707,\"journal\":{\"name\":\"Conference Quality Production Improvement – CQPI\",\"volume\":\"18 4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Quality Production Improvement – CQPI\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/cqpi-2020-0019\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Quality Production Improvement – CQPI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/cqpi-2020-0019","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

摘要本研究的目的是利用8D方法解决挖掘机设计活塞环安装不正确的生产问题。所使用的方法的思想是正确识别问题的原因,并实施纠正措施,以防止问题的再次发生。为了发现尽可能多的不合规的潜在原因,工作团队进行了头脑风暴会议,然后开发了Ishikawa图。团队成员发现,最常见的问题来源是人为错误。为了消除这种情况,决定举办一系列培训班,并增加装配站的装备。本文提出的解决质量问题的方法适用于每一个生产企业。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Improving the Effectiveness of Proceedings with Disagreements in a Production Process with Applying of Report 8D
Abstract The aim of the study is to use the 8D methodology to solve the production problem, which was the incorrect installation of the rings in the piston designed for excavators. The idea of the method used is to correctly identify the causes of the problem and implement corrective actions to prevent recurrence of the problem. In order to detect as many potential causes of non-compliance as possible, the working team conducted brainstorming sessions and then developed the Ishikawa diagram. Team members found that the most common source of the problem was human error. In order to eliminate it, it was decided to carry out a series of training courses and to additionally equip assembly stations. The presented methodology of solving quality problems can be implied in every production company.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信