{"title":"基于DCOPF的隐式和顺序市场出清FRR交换最优传输容量预留","authors":"Y. Gebrekiros, G. Doorman, S. Jaehnert","doi":"10.1109/EEM.2015.7216727","DOIUrl":null,"url":null,"abstract":"The European power system is experiencing a massive renewable penetration, increased meshing of the grid, and electricity market integration. This calls for market design options that can cope with the challenges resulting from the ongoing developments. Based on a DC optimal power flow (DCOPF) formulation, this paper analyzes the impact of market design options on the optimal transmission allocation for Frequency Restoration Reserves (FRR) exchange in the Northern Europe power markets. We consider implicit and sequential electricity market clearance options and assess the findings according to the total costs, optimal transmission capacity allocation, and regional FRR procurement. The results show that, as a result of increased market efficiency obtained by applying the implicit market clearance option, it is less expensive, and results in comparatively lower transmission capacity allocation from the Nordic system to the interconnected regions.","PeriodicalId":252103,"journal":{"name":"2015 12th International Conference on the European Energy Market (EEM)","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-05-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"DCOPF based optimal transmission capacity reservation for FRR exchange using implicit and sequential market clearance\",\"authors\":\"Y. Gebrekiros, G. Doorman, S. Jaehnert\",\"doi\":\"10.1109/EEM.2015.7216727\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The European power system is experiencing a massive renewable penetration, increased meshing of the grid, and electricity market integration. This calls for market design options that can cope with the challenges resulting from the ongoing developments. Based on a DC optimal power flow (DCOPF) formulation, this paper analyzes the impact of market design options on the optimal transmission allocation for Frequency Restoration Reserves (FRR) exchange in the Northern Europe power markets. We consider implicit and sequential electricity market clearance options and assess the findings according to the total costs, optimal transmission capacity allocation, and regional FRR procurement. The results show that, as a result of increased market efficiency obtained by applying the implicit market clearance option, it is less expensive, and results in comparatively lower transmission capacity allocation from the Nordic system to the interconnected regions.\",\"PeriodicalId\":252103,\"journal\":{\"name\":\"2015 12th International Conference on the European Energy Market (EEM)\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-05-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 12th International Conference on the European Energy Market (EEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEM.2015.7216727\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 12th International Conference on the European Energy Market (EEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2015.7216727","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
DCOPF based optimal transmission capacity reservation for FRR exchange using implicit and sequential market clearance
The European power system is experiencing a massive renewable penetration, increased meshing of the grid, and electricity market integration. This calls for market design options that can cope with the challenges resulting from the ongoing developments. Based on a DC optimal power flow (DCOPF) formulation, this paper analyzes the impact of market design options on the optimal transmission allocation for Frequency Restoration Reserves (FRR) exchange in the Northern Europe power markets. We consider implicit and sequential electricity market clearance options and assess the findings according to the total costs, optimal transmission capacity allocation, and regional FRR procurement. The results show that, as a result of increased market efficiency obtained by applying the implicit market clearance option, it is less expensive, and results in comparatively lower transmission capacity allocation from the Nordic system to the interconnected regions.