{"title":"项目活动排序的广义网络方法","authors":"R. Freeman","doi":"10.1109/IRET-EM.1960.5007550","DOIUrl":null,"url":null,"abstract":"R and D projects are viewed as networks of inter-related events to be achieved in proper ordered sequence. This paper generalizes some earlier work. The present paper takes cognizance of technical performance and scarce resources as well as time. By means of the analysis presented herein, it is possible to find the optimal combination of time, technical performance level, and resources for any project.","PeriodicalId":382847,"journal":{"name":"IRE Transactions on Engineering Management","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1960-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"32","resultStr":"{\"title\":\"A Generalized Network Approach to Project Activity Sequencing\",\"authors\":\"R. Freeman\",\"doi\":\"10.1109/IRET-EM.1960.5007550\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"R and D projects are viewed as networks of inter-related events to be achieved in proper ordered sequence. This paper generalizes some earlier work. The present paper takes cognizance of technical performance and scarce resources as well as time. By means of the analysis presented herein, it is possible to find the optimal combination of time, technical performance level, and resources for any project.\",\"PeriodicalId\":382847,\"journal\":{\"name\":\"IRE Transactions on Engineering Management\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1960-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"32\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IRE Transactions on Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IRET-EM.1960.5007550\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IRE Transactions on Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IRET-EM.1960.5007550","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A Generalized Network Approach to Project Activity Sequencing
R and D projects are viewed as networks of inter-related events to be achieved in proper ordered sequence. This paper generalizes some earlier work. The present paper takes cognizance of technical performance and scarce resources as well as time. By means of the analysis presented herein, it is possible to find the optimal combination of time, technical performance level, and resources for any project.