{"title":"俄罗斯天然气工业股份公司基础设施项目采购中的结构性选择","authors":"L. Plekhanova, A. E. Shpilevaya","doi":"10.38050/2078-3809-2020-12-4-88-116","DOIUrl":null,"url":null,"abstract":" The paper analyzes structural alternatives in the implementation of infrastructure projects on the example of main gas pipelines. Particular attention is paid to the impact of various forms of procurement procedures on the course and result of the implementation of the infrastructure project as a whole. It is shown that the choice of procurement method can influence the structure of incentives and risks of the parties involved, as well as indirectly impact on the establishment of the market price setting, the level of product quality in the industry, and the complex cost of project implementation. Noting the extreme importance of the issues of ensuring the quality of the products used, the authors review the available structural alternatives for organizing quality control, show the possible mechanisms of the influence of the downtime of enterprises on reducing the level of industry competencies.","PeriodicalId":290417,"journal":{"name":"Scientific Research of Faculty of Economics. Electronic Journal","volume":"87 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Structural Alternatives in Procurement of Gazprom Infrastructure Projects\",\"authors\":\"L. Plekhanova, A. E. Shpilevaya\",\"doi\":\"10.38050/2078-3809-2020-12-4-88-116\",\"DOIUrl\":null,\"url\":null,\"abstract\":\" The paper analyzes structural alternatives in the implementation of infrastructure projects on the example of main gas pipelines. Particular attention is paid to the impact of various forms of procurement procedures on the course and result of the implementation of the infrastructure project as a whole. It is shown that the choice of procurement method can influence the structure of incentives and risks of the parties involved, as well as indirectly impact on the establishment of the market price setting, the level of product quality in the industry, and the complex cost of project implementation. Noting the extreme importance of the issues of ensuring the quality of the products used, the authors review the available structural alternatives for organizing quality control, show the possible mechanisms of the influence of the downtime of enterprises on reducing the level of industry competencies.\",\"PeriodicalId\":290417,\"journal\":{\"name\":\"Scientific Research of Faculty of Economics. Electronic Journal\",\"volume\":\"87 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scientific Research of Faculty of Economics. Electronic Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.38050/2078-3809-2020-12-4-88-116\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Research of Faculty of Economics. Electronic Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.38050/2078-3809-2020-12-4-88-116","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Structural Alternatives in Procurement of Gazprom Infrastructure Projects
The paper analyzes structural alternatives in the implementation of infrastructure projects on the example of main gas pipelines. Particular attention is paid to the impact of various forms of procurement procedures on the course and result of the implementation of the infrastructure project as a whole. It is shown that the choice of procurement method can influence the structure of incentives and risks of the parties involved, as well as indirectly impact on the establishment of the market price setting, the level of product quality in the industry, and the complex cost of project implementation. Noting the extreme importance of the issues of ensuring the quality of the products used, the authors review the available structural alternatives for organizing quality control, show the possible mechanisms of the influence of the downtime of enterprises on reducing the level of industry competencies.