使用Arena仿真的维护人力调度

Z. Alwadood, I. Kassim, R. M. Rani
{"title":"使用Arena仿真的维护人力调度","authors":"Z. Alwadood, I. Kassim, R. M. Rani","doi":"10.1109/ICCRD.2010.111","DOIUrl":null,"url":null,"abstract":"This paper analyzed the problem faced by a maintenance department of an Information Technology company, which recorded a huge amount of penalty cost each month. The cost is incurred when a service breakdown is solved beyond the agreed-upon duration, as distinctively stated in the Service Level Agreement established with its customers. Therefore, the objective of the paper is to present a workforce schedule model that would minimize the average total time of service in the system and maximize the total number of completed jobs. A simulation modeling was used and two alternatives of workforce schedule are compared. In comparison to the existing schedule, switching to the first alternative of Grouped-Efficiency-based Staff Schedule is expected to reduce the average total time in system of the highest severity service by 69% and increase the total number of completed jobs by 15.7%.","PeriodicalId":158568,"journal":{"name":"2010 Second International Conference on Computer Research and Development","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Maintenance Workforce Scheduling Using Arena Simulation\",\"authors\":\"Z. Alwadood, I. Kassim, R. M. Rani\",\"doi\":\"10.1109/ICCRD.2010.111\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper analyzed the problem faced by a maintenance department of an Information Technology company, which recorded a huge amount of penalty cost each month. The cost is incurred when a service breakdown is solved beyond the agreed-upon duration, as distinctively stated in the Service Level Agreement established with its customers. Therefore, the objective of the paper is to present a workforce schedule model that would minimize the average total time of service in the system and maximize the total number of completed jobs. A simulation modeling was used and two alternatives of workforce schedule are compared. In comparison to the existing schedule, switching to the first alternative of Grouped-Efficiency-based Staff Schedule is expected to reduce the average total time in system of the highest severity service by 69% and increase the total number of completed jobs by 15.7%.\",\"PeriodicalId\":158568,\"journal\":{\"name\":\"2010 Second International Conference on Computer Research and Development\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-05-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 Second International Conference on Computer Research and Development\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCRD.2010.111\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 Second International Conference on Computer Research and Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCRD.2010.111","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

本文分析了某信息技术公司的维修部所面临的问题,该部门每月的罚款费用数额巨大。在与客户签订的《服务水平协议》中明确规定的服务故障解决时间超出约定期限时,发生该费用。因此,本文的目标是提出一个劳动力调度模型,该模型将使系统的平均总服务时间最小化,并使完成的工作总数最大化。采用仿真建模的方法,比较了两种不同的劳动力调度方案。与现有的时间表相比,切换到第一种选择的基于分组效率的员工时间表预计将使最高级别服务系统的平均总时间减少69%,并将完成的工作总数增加15.7%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Maintenance Workforce Scheduling Using Arena Simulation
This paper analyzed the problem faced by a maintenance department of an Information Technology company, which recorded a huge amount of penalty cost each month. The cost is incurred when a service breakdown is solved beyond the agreed-upon duration, as distinctively stated in the Service Level Agreement established with its customers. Therefore, the objective of the paper is to present a workforce schedule model that would minimize the average total time of service in the system and maximize the total number of completed jobs. A simulation modeling was used and two alternatives of workforce schedule are compared. In comparison to the existing schedule, switching to the first alternative of Grouped-Efficiency-based Staff Schedule is expected to reduce the average total time in system of the highest severity service by 69% and increase the total number of completed jobs by 15.7%.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信