通过低完井设计优化管理碳酸盐岩气藏的不确定性和意外

H. Bakar, C. Bernard, Karim Ahmed Shata, Muhamad Ridzuan Shaedin, C. H. Roh, Khairul EzeeAzreen B M Khir
{"title":"通过低完井设计优化管理碳酸盐岩气藏的不确定性和意外","authors":"H. Bakar, C. Bernard, Karim Ahmed Shata, Muhamad Ridzuan Shaedin, C. H. Roh, Khairul EzeeAzreen B M Khir","doi":"10.2118/191041-MS","DOIUrl":null,"url":null,"abstract":"\n There are three (3) requirements of any completion in common; safe, economical efficient and reliable. 76% of PETRONAS CarigaliSdnBhd's wells in Sarawak Gas are completed in porous, heterogeneous and complex carbonate reservoirs. Four (4) types of lower completions are implemented for carbonatereservoir: barefoot, open hole Pre-Drilled Liner (PDL) with isolation packer, open hole blank liner with isolation packer with post perforation and cemented cased hole. This paper shares the best practices, lessons learnt, risks and performance from recent experiences at field FX, FY and N which are used to support the proposed lower completion design and selection criteria workflow.\n Other than risk of wellbore collapse, early water breakthrough and fluid losses to formation, the provision for zonal isolation, cost, well productivity and complexity of operation have been part of the critical elements to be considered in the proposed process workflow from planning to execution phase. Dedicated studies such as wellbore stability analysis, critical drawdown requirement over time and well modeling are also being carried out to provide enhancment of lower completion design.\n This selection criteria and lower completion design process flow has been applied in recent FY field development campaign which resulted 32% of cost saving in 3 horizontal wells and met the production gas target with zero Lost Time Injury (LTI).\n The other particular merit of this paper is to share some the best practices and lessons learnt from FX, FY and N field case histories and the approaches taken to manage the risks.","PeriodicalId":133825,"journal":{"name":"Day 3 Wed, August 29, 2018","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Managing Uncertainties and Surprises in Carbonate Gas Reservoir through Lower Completion Design Optimisation\",\"authors\":\"H. Bakar, C. Bernard, Karim Ahmed Shata, Muhamad Ridzuan Shaedin, C. H. Roh, Khairul EzeeAzreen B M Khir\",\"doi\":\"10.2118/191041-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n There are three (3) requirements of any completion in common; safe, economical efficient and reliable. 76% of PETRONAS CarigaliSdnBhd's wells in Sarawak Gas are completed in porous, heterogeneous and complex carbonate reservoirs. Four (4) types of lower completions are implemented for carbonatereservoir: barefoot, open hole Pre-Drilled Liner (PDL) with isolation packer, open hole blank liner with isolation packer with post perforation and cemented cased hole. This paper shares the best practices, lessons learnt, risks and performance from recent experiences at field FX, FY and N which are used to support the proposed lower completion design and selection criteria workflow.\\n Other than risk of wellbore collapse, early water breakthrough and fluid losses to formation, the provision for zonal isolation, cost, well productivity and complexity of operation have been part of the critical elements to be considered in the proposed process workflow from planning to execution phase. Dedicated studies such as wellbore stability analysis, critical drawdown requirement over time and well modeling are also being carried out to provide enhancment of lower completion design.\\n This selection criteria and lower completion design process flow has been applied in recent FY field development campaign which resulted 32% of cost saving in 3 horizontal wells and met the production gas target with zero Lost Time Injury (LTI).\\n The other particular merit of this paper is to share some the best practices and lessons learnt from FX, FY and N field case histories and the approaches taken to manage the risks.\",\"PeriodicalId\":133825,\"journal\":{\"name\":\"Day 3 Wed, August 29, 2018\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-08-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, August 29, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/191041-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, August 29, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/191041-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

任何完成都有三(3)个共同要求;安全、经济、可靠。PETRONAS CarigaliSdnBhd在Sarawak Gas的76%的井是在多孔、非均质和复杂的碳酸盐岩储层中完成的。针对碳酸盐岩油藏,采用了四种类型的下完井方法:赤脚、裸眼预钻尾管(PDL)与隔离封隔器、裸眼空白尾管与隔离封隔器、射孔后固井套管井。本文分享了近期在FX、FY和N油田的最佳实践、经验教训、风险和表现,用于支持拟议的较低完井设计和选择标准工作流程。除了井筒坍塌、早期破水和地层流体流失的风险外,层间隔离的提供、成本、油井产能和操作的复杂性是拟议的工艺流程从规划到执行阶段需要考虑的关键因素。此外,还进行了一些专门的研究,如井筒稳定性分析、随时间推移的临界压降要求和井建模,以提高下部完井设计的质量。该选择标准和更低的完井设计流程已应用于最近的FY油田开发活动,在3口水平井中节省了32%的成本,并在零损失时间(LTI)的情况下达到了生产气目标。本文的另一个特别优点是分享了从FX、FY和N领域的案例历史和管理风险的方法中获得的一些最佳实践和经验教训。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Managing Uncertainties and Surprises in Carbonate Gas Reservoir through Lower Completion Design Optimisation
There are three (3) requirements of any completion in common; safe, economical efficient and reliable. 76% of PETRONAS CarigaliSdnBhd's wells in Sarawak Gas are completed in porous, heterogeneous and complex carbonate reservoirs. Four (4) types of lower completions are implemented for carbonatereservoir: barefoot, open hole Pre-Drilled Liner (PDL) with isolation packer, open hole blank liner with isolation packer with post perforation and cemented cased hole. This paper shares the best practices, lessons learnt, risks and performance from recent experiences at field FX, FY and N which are used to support the proposed lower completion design and selection criteria workflow. Other than risk of wellbore collapse, early water breakthrough and fluid losses to formation, the provision for zonal isolation, cost, well productivity and complexity of operation have been part of the critical elements to be considered in the proposed process workflow from planning to execution phase. Dedicated studies such as wellbore stability analysis, critical drawdown requirement over time and well modeling are also being carried out to provide enhancment of lower completion design. This selection criteria and lower completion design process flow has been applied in recent FY field development campaign which resulted 32% of cost saving in 3 horizontal wells and met the production gas target with zero Lost Time Injury (LTI). The other particular merit of this paper is to share some the best practices and lessons learnt from FX, FY and N field case histories and the approaches taken to manage the risks.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信