{"title":"不同项目交付体系的项目绩效比较分析","authors":"Michael Ibrahim, A. Hanna","doi":"10.24928/2019/0183","DOIUrl":null,"url":null,"abstract":"Project Delivery System (PDS) defines the relationship and timing of involvement between different contracting parties. The main PDSs referred to in cited literature are: Design-BidBuild (DBB), Construction Management at Risk (CMR), Design-Build (DB), and Integrated Project Delivery (IPD). By applying statistical tests such as Analysis of Variance (ANOVA) F-test and Kruskal-Wallis H-test to a dataset of 109 projects, this paper compares the performance of the four PDSs. As a result, statistically significant performance differences among the examined PDSs were identified in five performance areas: cost, schedule, quality, communication, and change management. Furthermore, performing pairwise comparisons using post-hoc statistical tests to each pair of PDSs shows that DBB performs markedly worse than the other examined PDSs, especially IPD. The findings presented in this paper should encourage industry professionals to move away from the DBB model, and towards IPD and other synergic PDSs.","PeriodicalId":278113,"journal":{"name":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Comparative Analysis of Project Performance Between Different Project Delivery Systems\",\"authors\":\"Michael Ibrahim, A. Hanna\",\"doi\":\"10.24928/2019/0183\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Project Delivery System (PDS) defines the relationship and timing of involvement between different contracting parties. The main PDSs referred to in cited literature are: Design-BidBuild (DBB), Construction Management at Risk (CMR), Design-Build (DB), and Integrated Project Delivery (IPD). By applying statistical tests such as Analysis of Variance (ANOVA) F-test and Kruskal-Wallis H-test to a dataset of 109 projects, this paper compares the performance of the four PDSs. As a result, statistically significant performance differences among the examined PDSs were identified in five performance areas: cost, schedule, quality, communication, and change management. Furthermore, performing pairwise comparisons using post-hoc statistical tests to each pair of PDSs shows that DBB performs markedly worse than the other examined PDSs, especially IPD. The findings presented in this paper should encourage industry professionals to move away from the DBB model, and towards IPD and other synergic PDSs.\",\"PeriodicalId\":278113,\"journal\":{\"name\":\"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24928/2019/0183\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2019/0183","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Comparative Analysis of Project Performance Between Different Project Delivery Systems
Project Delivery System (PDS) defines the relationship and timing of involvement between different contracting parties. The main PDSs referred to in cited literature are: Design-BidBuild (DBB), Construction Management at Risk (CMR), Design-Build (DB), and Integrated Project Delivery (IPD). By applying statistical tests such as Analysis of Variance (ANOVA) F-test and Kruskal-Wallis H-test to a dataset of 109 projects, this paper compares the performance of the four PDSs. As a result, statistically significant performance differences among the examined PDSs were identified in five performance areas: cost, schedule, quality, communication, and change management. Furthermore, performing pairwise comparisons using post-hoc statistical tests to each pair of PDSs shows that DBB performs markedly worse than the other examined PDSs, especially IPD. The findings presented in this paper should encourage industry professionals to move away from the DBB model, and towards IPD and other synergic PDSs.