{"title":"费米实验室直线加速器和助推器加速器的挑战","authors":"R. Webber","doi":"10.1109/PAC.2001.987838","DOIUrl":null,"url":null,"abstract":"A report on the challenges confronting the Fermilab Linac and Booster accelerators is presented. Plans to face those challenges are discussed. Historically, the Linac/Booster system has served only as an injector for the relatively low repetition rate Main Ring synchrotron. With construction of an 8 GeV target station for the 5 Hz MiniBooNE neutrino beam and requirements for rapid multi-batch injection into the Main Injector for the NUMI/MINOS experiment, the demand for 8 GeV protons will increase more than an order of magnitude above recent high levels. To meet this challenge, enhanced ion source performance, better Booster orbit control, a beam loss collimation/localization system, and improved diagnostics are among the items being pursued. Booster beam loss reduction and control are key to the entire near future Fermilab high energy physics program.","PeriodicalId":313758,"journal":{"name":"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-07-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Challenges to the Fermilab linac and Booster accelerators\",\"authors\":\"R. Webber\",\"doi\":\"10.1109/PAC.2001.987838\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A report on the challenges confronting the Fermilab Linac and Booster accelerators is presented. Plans to face those challenges are discussed. Historically, the Linac/Booster system has served only as an injector for the relatively low repetition rate Main Ring synchrotron. With construction of an 8 GeV target station for the 5 Hz MiniBooNE neutrino beam and requirements for rapid multi-batch injection into the Main Injector for the NUMI/MINOS experiment, the demand for 8 GeV protons will increase more than an order of magnitude above recent high levels. To meet this challenge, enhanced ion source performance, better Booster orbit control, a beam loss collimation/localization system, and improved diagnostics are among the items being pursued. Booster beam loss reduction and control are key to the entire near future Fermilab high energy physics program.\",\"PeriodicalId\":313758,\"journal\":{\"name\":\"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-07-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PAC.2001.987838\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAC.2001.987838","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Challenges to the Fermilab linac and Booster accelerators
A report on the challenges confronting the Fermilab Linac and Booster accelerators is presented. Plans to face those challenges are discussed. Historically, the Linac/Booster system has served only as an injector for the relatively low repetition rate Main Ring synchrotron. With construction of an 8 GeV target station for the 5 Hz MiniBooNE neutrino beam and requirements for rapid multi-batch injection into the Main Injector for the NUMI/MINOS experiment, the demand for 8 GeV protons will increase more than an order of magnitude above recent high levels. To meet this challenge, enhanced ion source performance, better Booster orbit control, a beam loss collimation/localization system, and improved diagnostics are among the items being pursued. Booster beam loss reduction and control are key to the entire near future Fermilab high energy physics program.