项目资金对政府资助项目实施的影响——以梅鲁县伊门提北副县为例

Lenah Nkirote, Kiambi, Dr. S. Ngacha Njeri
{"title":"项目资金对政府资助项目实施的影响——以梅鲁县伊门提北副县为例","authors":"Lenah Nkirote, Kiambi, Dr. S. Ngacha Njeri","doi":"10.37284/eajbe.6.1.1284","DOIUrl":null,"url":null,"abstract":"Monitoring and evaluation is a critical component of project design, execution, and management. Kenyan county administrations have been carrying out development projects since 2013, but the completion of some of the development projects has faced serious implementation challenges. This study analysed the monitoring and evaluation practices that influence the implementation of a project that is financed by funds from the government. The targeted population comprised 113 staff working in the selected five departments in Meru County Government that deal with projects at the sub-county level. A sample size of 92 staff participated in the study. Staff was selected using the proportionate stratified together with a simple random sampling technique, while all heads of department were purposively picked. A questionnaire was distributed to staff while HODs were interviewed. Piloting enabled checking the reliability and validity of instruments. The mean and standard deviation helped to summarise the collected data. The results indicated that project funding, competencies of a project manager, employee capacity building and community participation were empirically confirmed to have significant weight on the successful implementation of projects. The study noted that reliable revenue streams, standards, best practices, and a well-designed financial plan are essential for the successful implementation of projects. The study recommends the need for the county government to allocate sufficient funding at the project’s inception to facilitate the acquisition of requisite equipment and finance initial operational activities. The government departments at the county level should prioritise enhancing the project management skills of staff involved in projects. The finishing of the identified projects is indispensable; hence, the results will change the manner in which government-funded projects are implemented by the county government.","PeriodicalId":378318,"journal":{"name":"East African Journal of Business and Economics","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Influence of Project Funding on Implementation of Government-Funded Projects in Imenti North Sub-County, Meru County\",\"authors\":\"Lenah Nkirote, Kiambi, Dr. S. Ngacha Njeri\",\"doi\":\"10.37284/eajbe.6.1.1284\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Monitoring and evaluation is a critical component of project design, execution, and management. Kenyan county administrations have been carrying out development projects since 2013, but the completion of some of the development projects has faced serious implementation challenges. This study analysed the monitoring and evaluation practices that influence the implementation of a project that is financed by funds from the government. The targeted population comprised 113 staff working in the selected five departments in Meru County Government that deal with projects at the sub-county level. A sample size of 92 staff participated in the study. Staff was selected using the proportionate stratified together with a simple random sampling technique, while all heads of department were purposively picked. A questionnaire was distributed to staff while HODs were interviewed. Piloting enabled checking the reliability and validity of instruments. The mean and standard deviation helped to summarise the collected data. The results indicated that project funding, competencies of a project manager, employee capacity building and community participation were empirically confirmed to have significant weight on the successful implementation of projects. The study noted that reliable revenue streams, standards, best practices, and a well-designed financial plan are essential for the successful implementation of projects. The study recommends the need for the county government to allocate sufficient funding at the project’s inception to facilitate the acquisition of requisite equipment and finance initial operational activities. The government departments at the county level should prioritise enhancing the project management skills of staff involved in projects. The finishing of the identified projects is indispensable; hence, the results will change the manner in which government-funded projects are implemented by the county government.\",\"PeriodicalId\":378318,\"journal\":{\"name\":\"East African Journal of Business and Economics\",\"volume\":\"40 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"East African Journal of Business and Economics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37284/eajbe.6.1.1284\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"East African Journal of Business and Economics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37284/eajbe.6.1.1284","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

监测和评估是项目设计、执行和管理的关键组成部分。自2013年以来,肯尼亚县政府一直在开展开发项目,但一些开发项目的完成面临着严重的实施挑战。本研究分析了影响政府资助项目实施的监测和评估做法。目标人口包括在梅鲁县政府选定的五个部门工作的113名工作人员,这些部门负责处理县以下一级的项目。共有92名员工参与了这项研究。采用比例分层和简单随机抽样相结合的方法选择工作人员,有目的地选择所有部门负责人。本署向员工派发问卷,并与屋主面谈。引航能够检查仪器的可靠性和有效性。平均值和标准偏差有助于总结所收集的数据。结果表明,项目资金、项目经理能力、员工能力建设和社区参与对项目的成功实施具有显著的权重。该研究指出,可靠的收入来源、标准、最佳做法和精心设计的财务计划对于项目的成功实施至关重要。研究报告建议,县政府有必要在项目开始时拨出足够的资金,以便利购置必要的设备和资助最初的业务活动。县级政府部门要优先提高参与项目工作人员的项目管理能力。完成已确定的项目是必不可少的;因此,结果将改变县政府实施政府资助项目的方式。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Influence of Project Funding on Implementation of Government-Funded Projects in Imenti North Sub-County, Meru County
Monitoring and evaluation is a critical component of project design, execution, and management. Kenyan county administrations have been carrying out development projects since 2013, but the completion of some of the development projects has faced serious implementation challenges. This study analysed the monitoring and evaluation practices that influence the implementation of a project that is financed by funds from the government. The targeted population comprised 113 staff working in the selected five departments in Meru County Government that deal with projects at the sub-county level. A sample size of 92 staff participated in the study. Staff was selected using the proportionate stratified together with a simple random sampling technique, while all heads of department were purposively picked. A questionnaire was distributed to staff while HODs were interviewed. Piloting enabled checking the reliability and validity of instruments. The mean and standard deviation helped to summarise the collected data. The results indicated that project funding, competencies of a project manager, employee capacity building and community participation were empirically confirmed to have significant weight on the successful implementation of projects. The study noted that reliable revenue streams, standards, best practices, and a well-designed financial plan are essential for the successful implementation of projects. The study recommends the need for the county government to allocate sufficient funding at the project’s inception to facilitate the acquisition of requisite equipment and finance initial operational activities. The government departments at the county level should prioritise enhancing the project management skills of staff involved in projects. The finishing of the identified projects is indispensable; hence, the results will change the manner in which government-funded projects are implemented by the county government.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信