瑞典峰值电力储备市场需求弹性盈利能力分析

C. Sandels, M. Hagelberg, L. Nordström
{"title":"瑞典峰值电力储备市场需求弹性盈利能力分析","authors":"C. Sandels, M. Hagelberg, L. Nordström","doi":"10.1109/ISGT.2013.6497922","DOIUrl":null,"url":null,"abstract":"In this paper, a load reduction Aggregator participating on the Swedish Peak Power Reserve (PPR) market was analyzed. The load reduction was provided by electric heating systems in larger dwellings (e.g., office buildings). Two simulation models were developed to assess the market performance of the Aggregator. From the simulation results it was concluded that the PPR market was not optimal for the proposed Aggregator. Among other things, the market was too inflexible and the profits were just a small subvention of the larger day-ahead electricity purchases. Also, it was concluded that the Aggregator was exposed to several risks by participating on the market, e.g. situations of shortage in available power capacity. A number of countermeasures to mitigate these risks were presented.","PeriodicalId":268687,"journal":{"name":"2013 IEEE PES Innovative Smart Grid Technologies Conference (ISGT)","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-04-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Analysis on the profitability of demand flexibility on the swedish peak power reserve market\",\"authors\":\"C. Sandels, M. Hagelberg, L. Nordström\",\"doi\":\"10.1109/ISGT.2013.6497922\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, a load reduction Aggregator participating on the Swedish Peak Power Reserve (PPR) market was analyzed. The load reduction was provided by electric heating systems in larger dwellings (e.g., office buildings). Two simulation models were developed to assess the market performance of the Aggregator. From the simulation results it was concluded that the PPR market was not optimal for the proposed Aggregator. Among other things, the market was too inflexible and the profits were just a small subvention of the larger day-ahead electricity purchases. Also, it was concluded that the Aggregator was exposed to several risks by participating on the market, e.g. situations of shortage in available power capacity. A number of countermeasures to mitigate these risks were presented.\",\"PeriodicalId\":268687,\"journal\":{\"name\":\"2013 IEEE PES Innovative Smart Grid Technologies Conference (ISGT)\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-04-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 IEEE PES Innovative Smart Grid Technologies Conference (ISGT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISGT.2013.6497922\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE PES Innovative Smart Grid Technologies Conference (ISGT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGT.2013.6497922","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

本文分析了一种参与瑞典峰值电力储备(PPR)市场的减载聚合器。减少的负荷是由较大住宅(例如办公大楼)的电加热系统提供的。开发了两个仿真模型来评估聚合器的市场性能。仿真结果表明,该聚合器对PPR市场不是最优的。除此之外,市场太不灵活,利润只是提前一天购买更多电力的一小部分补贴。此外,本文还总结了聚合器参与市场的几个风险,例如可用电力容量不足的情况。提出了减轻这些风险的若干对策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis on the profitability of demand flexibility on the swedish peak power reserve market
In this paper, a load reduction Aggregator participating on the Swedish Peak Power Reserve (PPR) market was analyzed. The load reduction was provided by electric heating systems in larger dwellings (e.g., office buildings). Two simulation models were developed to assess the market performance of the Aggregator. From the simulation results it was concluded that the PPR market was not optimal for the proposed Aggregator. Among other things, the market was too inflexible and the profits were just a small subvention of the larger day-ahead electricity purchases. Also, it was concluded that the Aggregator was exposed to several risks by participating on the market, e.g. situations of shortage in available power capacity. A number of countermeasures to mitigate these risks were presented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信