{"title":"生产管理信息系统","authors":"J. Reitman, Thomas J. Burke","doi":"10.1109/TSSC.1968.300170","DOIUrl":null,"url":null,"abstract":"A Management Information System has been developed and implemented using General Purpose Simulation System (GPSS)/360. The system provided the following data for a solid-state production facility: 1) current location of wafers showing work orders started, total daily production, and rejects; 2) yesterday's and accumulated yield by step, and projection of number of finished wafers from this quantity; 3) location of dormant work orders, i.e., orders that had not moved for a specified time; 4) current utilization of equipment and manpower; 5) number of orders awaiting processing at each step and how long they have been waiting; 6) daily operations schedule of wafers to be processed each day according to a predetermined priority structure; and 7) delivery forecast for when orders would be shipped and how the date varies according to resources applied. The inventory status data were structured in GPSS/360 to provide a common data format for both current status and forecasting. This fully operational system was developed to satisfy specific solid-state management requirements. This system was organized in a general manner for flexibility and change and could be modified to be used as a management information system for other types of operations.","PeriodicalId":120916,"journal":{"name":"IEEE Trans. Syst. Sci. Cybern.","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1968-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Production Management Information System\",\"authors\":\"J. Reitman, Thomas J. Burke\",\"doi\":\"10.1109/TSSC.1968.300170\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A Management Information System has been developed and implemented using General Purpose Simulation System (GPSS)/360. The system provided the following data for a solid-state production facility: 1) current location of wafers showing work orders started, total daily production, and rejects; 2) yesterday's and accumulated yield by step, and projection of number of finished wafers from this quantity; 3) location of dormant work orders, i.e., orders that had not moved for a specified time; 4) current utilization of equipment and manpower; 5) number of orders awaiting processing at each step and how long they have been waiting; 6) daily operations schedule of wafers to be processed each day according to a predetermined priority structure; and 7) delivery forecast for when orders would be shipped and how the date varies according to resources applied. The inventory status data were structured in GPSS/360 to provide a common data format for both current status and forecasting. This fully operational system was developed to satisfy specific solid-state management requirements. This system was organized in a general manner for flexibility and change and could be modified to be used as a management information system for other types of operations.\",\"PeriodicalId\":120916,\"journal\":{\"name\":\"IEEE Trans. Syst. Sci. Cybern.\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1968-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Trans. Syst. Sci. Cybern.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TSSC.1968.300170\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Trans. Syst. Sci. Cybern.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TSSC.1968.300170","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A Management Information System has been developed and implemented using General Purpose Simulation System (GPSS)/360. The system provided the following data for a solid-state production facility: 1) current location of wafers showing work orders started, total daily production, and rejects; 2) yesterday's and accumulated yield by step, and projection of number of finished wafers from this quantity; 3) location of dormant work orders, i.e., orders that had not moved for a specified time; 4) current utilization of equipment and manpower; 5) number of orders awaiting processing at each step and how long they have been waiting; 6) daily operations schedule of wafers to be processed each day according to a predetermined priority structure; and 7) delivery forecast for when orders would be shipped and how the date varies according to resources applied. The inventory status data were structured in GPSS/360 to provide a common data format for both current status and forecasting. This fully operational system was developed to satisfy specific solid-state management requirements. This system was organized in a general manner for flexibility and change and could be modified to be used as a management information system for other types of operations.