{"title":"800和1200千伏断路器的试验","authors":"R. Smeets, S. Kuivenhoven, A. Hofstee","doi":"10.1109/ICEPE-ST.2011.6122925","DOIUrl":null,"url":null,"abstract":"The most critical transient a circuit breaker has to endure during its operation is the transient recovery voltage (TRV), initiated by the electric power system as a natural reaction on current interruption. For circuit breakers intended to operate in ultra-high voltage systems (with rated voltage above 800 kV), the realization of realistic transient recovery voltages in testing of these circuit breakers becomes a real challenge. In this contribution a new and proven method is described of creating adequate TRVs by a double stage synthetic test circuit. Due to the extremely high voltages to be applied immediately after interruption of very high fault current, a two-stage approach is necessary. This is the only way to perform full-pole testing, the realistic laboratory simulation of service conditions during fault current interruption.","PeriodicalId":379448,"journal":{"name":"2011 1st International Conference on Electric Power Equipment - Switching Technology","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Testing of 800 and 1200 kV class circuit breakers\",\"authors\":\"R. Smeets, S. Kuivenhoven, A. Hofstee\",\"doi\":\"10.1109/ICEPE-ST.2011.6122925\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The most critical transient a circuit breaker has to endure during its operation is the transient recovery voltage (TRV), initiated by the electric power system as a natural reaction on current interruption. For circuit breakers intended to operate in ultra-high voltage systems (with rated voltage above 800 kV), the realization of realistic transient recovery voltages in testing of these circuit breakers becomes a real challenge. In this contribution a new and proven method is described of creating adequate TRVs by a double stage synthetic test circuit. Due to the extremely high voltages to be applied immediately after interruption of very high fault current, a two-stage approach is necessary. This is the only way to perform full-pole testing, the realistic laboratory simulation of service conditions during fault current interruption.\",\"PeriodicalId\":379448,\"journal\":{\"name\":\"2011 1st International Conference on Electric Power Equipment - Switching Technology\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 1st International Conference on Electric Power Equipment - Switching Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICEPE-ST.2011.6122925\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 1st International Conference on Electric Power Equipment - Switching Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEPE-ST.2011.6122925","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The most critical transient a circuit breaker has to endure during its operation is the transient recovery voltage (TRV), initiated by the electric power system as a natural reaction on current interruption. For circuit breakers intended to operate in ultra-high voltage systems (with rated voltage above 800 kV), the realization of realistic transient recovery voltages in testing of these circuit breakers becomes a real challenge. In this contribution a new and proven method is described of creating adequate TRVs by a double stage synthetic test circuit. Due to the extremely high voltages to be applied immediately after interruption of very high fault current, a two-stage approach is necessary. This is the only way to perform full-pole testing, the realistic laboratory simulation of service conditions during fault current interruption.