{"title":"800和1200千伏断路器的试验","authors":"R. Smeets, S. Kuivenhoven, A. Hofstee","doi":"10.1109/ICEPE-ST.2011.6122925","DOIUrl":null,"url":null,"abstract":"The most critical transient a circuit breaker has to endure during its operation is the transient recovery voltage (TRV), initiated by the electric power system as a natural reaction on current interruption. For circuit breakers intended to operate in ultra-high voltage systems (with rated voltage above 800 kV), the realization of realistic transient recovery voltages in testing of these circuit breakers becomes a real challenge. In this contribution a new and proven method is described of creating adequate TRVs by a double stage synthetic test circuit. Due to the extremely high voltages to be applied immediately after interruption of very high fault current, a two-stage approach is necessary. This is the only way to perform full-pole testing, the realistic laboratory simulation of service conditions during fault current interruption.","PeriodicalId":379448,"journal":{"name":"2011 1st International Conference on Electric Power Equipment - Switching Technology","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Testing of 800 and 1200 kV class circuit breakers\",\"authors\":\"R. Smeets, S. Kuivenhoven, A. Hofstee\",\"doi\":\"10.1109/ICEPE-ST.2011.6122925\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The most critical transient a circuit breaker has to endure during its operation is the transient recovery voltage (TRV), initiated by the electric power system as a natural reaction on current interruption. For circuit breakers intended to operate in ultra-high voltage systems (with rated voltage above 800 kV), the realization of realistic transient recovery voltages in testing of these circuit breakers becomes a real challenge. In this contribution a new and proven method is described of creating adequate TRVs by a double stage synthetic test circuit. Due to the extremely high voltages to be applied immediately after interruption of very high fault current, a two-stage approach is necessary. This is the only way to perform full-pole testing, the realistic laboratory simulation of service conditions during fault current interruption.\",\"PeriodicalId\":379448,\"journal\":{\"name\":\"2011 1st International Conference on Electric Power Equipment - Switching Technology\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 1st International Conference on Electric Power Equipment - Switching Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICEPE-ST.2011.6122925\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 1st International Conference on Electric Power Equipment - Switching Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEPE-ST.2011.6122925","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

断路器在运行过程中必须承受的最关键的暂态是暂态恢复电压(TRV),它是电力系统在电流中断时的自然反应而产生的。对于运行在超高压系统(额定电压800kv以上)中的断路器,如何在断路器的测试中实现符合实际的暂态恢复电压成为一个真正的挑战。在这个贡献中,描述了一种新的和经过验证的方法,通过双级合成测试电路创建足够的trv。由于在非常高的故障电流中断后立即施加极高的电压,因此有必要采用两级方法。这是进行全极测试的唯一途径,是在故障电流中断时对使用条件的真实实验室模拟。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Testing of 800 and 1200 kV class circuit breakers
The most critical transient a circuit breaker has to endure during its operation is the transient recovery voltage (TRV), initiated by the electric power system as a natural reaction on current interruption. For circuit breakers intended to operate in ultra-high voltage systems (with rated voltage above 800 kV), the realization of realistic transient recovery voltages in testing of these circuit breakers becomes a real challenge. In this contribution a new and proven method is described of creating adequate TRVs by a double stage synthetic test circuit. Due to the extremely high voltages to be applied immediately after interruption of very high fault current, a two-stage approach is necessary. This is the only way to perform full-pole testing, the realistic laboratory simulation of service conditions during fault current interruption.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信