{"title":"评估架空输电线路环境影响的目视方法","authors":"N. Erdmann, P. Schegner","doi":"10.1109/IYCE.2015.7180752","DOIUrl":null,"url":null,"abstract":"The German “Energiewende” requires a notable transmission network expansion. Since 2009, only approximately 400□km of 1877□km were realized. Most projects are delayed because of the low acceptance amongst local residents due to the perceived potential risk for the environment. This paper presents a transparent method of acquiring environmental parameters caused by the visibility of the transmission towers. These parameters can be used to evaluate several routes and designs of overhead transmission lines.","PeriodicalId":240209,"journal":{"name":"2015 5th International Youth Conference on Energy (IYCE)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-08-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Visual approach to assess the environmental impact of overhead transmission lines\",\"authors\":\"N. Erdmann, P. Schegner\",\"doi\":\"10.1109/IYCE.2015.7180752\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The German “Energiewende” requires a notable transmission network expansion. Since 2009, only approximately 400□km of 1877□km were realized. Most projects are delayed because of the low acceptance amongst local residents due to the perceived potential risk for the environment. This paper presents a transparent method of acquiring environmental parameters caused by the visibility of the transmission towers. These parameters can be used to evaluate several routes and designs of overhead transmission lines.\",\"PeriodicalId\":240209,\"journal\":{\"name\":\"2015 5th International Youth Conference on Energy (IYCE)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-08-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 5th International Youth Conference on Energy (IYCE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IYCE.2015.7180752\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 5th International Youth Conference on Energy (IYCE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IYCE.2015.7180752","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Visual approach to assess the environmental impact of overhead transmission lines
The German “Energiewende” requires a notable transmission network expansion. Since 2009, only approximately 400□km of 1877□km were realized. Most projects are delayed because of the low acceptance amongst local residents due to the perceived potential risk for the environment. This paper presents a transparent method of acquiring environmental parameters caused by the visibility of the transmission towers. These parameters can be used to evaluate several routes and designs of overhead transmission lines.