{"title":"使用FLAC指导的改进动态规划方法进行热单元承诺","authors":"S. Muralidharan, V. M. Kumar, A. Baalavignesh","doi":"10.1109/ICONRAEECE.2011.6129807","DOIUrl":null,"url":null,"abstract":"This paper presents a modified form of Dynamic Programming for solving Unit Commitment problem which encompass pre-dispatch and economic dispatch sub problems. The predispatch sub problem in UC is solved by unit classification based on Full Load Average production Cost. Solution for second sub problem is obtained using the modified form of DP. Modified form of dynamic programming technique suggested by this paper provides the generation schedule of individual generators in an analytical form even for a large number of variables without the traditional Lagrangian form. 10-generator system is tested using this algorithm for 24-hour scheduling horizon and the test result is compared with various other techniques. The result analysis exhibit the superiority of the proposed method.","PeriodicalId":305797,"journal":{"name":"2011 INTERNATIONAL CONFERENCE ON RECENT ADVANCEMENTS IN ELECTRICAL, ELECTRONICS AND CONTROL ENGINEERING","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Thermal Unit Commitment using FLAC guided modified dynamic programming approach\",\"authors\":\"S. Muralidharan, V. M. Kumar, A. Baalavignesh\",\"doi\":\"10.1109/ICONRAEECE.2011.6129807\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a modified form of Dynamic Programming for solving Unit Commitment problem which encompass pre-dispatch and economic dispatch sub problems. The predispatch sub problem in UC is solved by unit classification based on Full Load Average production Cost. Solution for second sub problem is obtained using the modified form of DP. Modified form of dynamic programming technique suggested by this paper provides the generation schedule of individual generators in an analytical form even for a large number of variables without the traditional Lagrangian form. 10-generator system is tested using this algorithm for 24-hour scheduling horizon and the test result is compared with various other techniques. The result analysis exhibit the superiority of the proposed method.\",\"PeriodicalId\":305797,\"journal\":{\"name\":\"2011 INTERNATIONAL CONFERENCE ON RECENT ADVANCEMENTS IN ELECTRICAL, ELECTRONICS AND CONTROL ENGINEERING\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 INTERNATIONAL CONFERENCE ON RECENT ADVANCEMENTS IN ELECTRICAL, ELECTRONICS AND CONTROL ENGINEERING\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICONRAEECE.2011.6129807\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 INTERNATIONAL CONFERENCE ON RECENT ADVANCEMENTS IN ELECTRICAL, ELECTRONICS AND CONTROL ENGINEERING","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICONRAEECE.2011.6129807","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Thermal Unit Commitment using FLAC guided modified dynamic programming approach
This paper presents a modified form of Dynamic Programming for solving Unit Commitment problem which encompass pre-dispatch and economic dispatch sub problems. The predispatch sub problem in UC is solved by unit classification based on Full Load Average production Cost. Solution for second sub problem is obtained using the modified form of DP. Modified form of dynamic programming technique suggested by this paper provides the generation schedule of individual generators in an analytical form even for a large number of variables without the traditional Lagrangian form. 10-generator system is tested using this algorithm for 24-hour scheduling horizon and the test result is compared with various other techniques. The result analysis exhibit the superiority of the proposed method.