使用FLAC指导的改进动态规划方法进行热单元承诺

S. Muralidharan, V. M. Kumar, A. Baalavignesh
{"title":"使用FLAC指导的改进动态规划方法进行热单元承诺","authors":"S. Muralidharan, V. M. Kumar, A. Baalavignesh","doi":"10.1109/ICONRAEECE.2011.6129807","DOIUrl":null,"url":null,"abstract":"This paper presents a modified form of Dynamic Programming for solving Unit Commitment problem which encompass pre-dispatch and economic dispatch sub problems. The predispatch sub problem in UC is solved by unit classification based on Full Load Average production Cost. Solution for second sub problem is obtained using the modified form of DP. Modified form of dynamic programming technique suggested by this paper provides the generation schedule of individual generators in an analytical form even for a large number of variables without the traditional Lagrangian form. 10-generator system is tested using this algorithm for 24-hour scheduling horizon and the test result is compared with various other techniques. The result analysis exhibit the superiority of the proposed method.","PeriodicalId":305797,"journal":{"name":"2011 INTERNATIONAL CONFERENCE ON RECENT ADVANCEMENTS IN ELECTRICAL, ELECTRONICS AND CONTROL ENGINEERING","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Thermal Unit Commitment using FLAC guided modified dynamic programming approach\",\"authors\":\"S. Muralidharan, V. M. Kumar, A. Baalavignesh\",\"doi\":\"10.1109/ICONRAEECE.2011.6129807\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a modified form of Dynamic Programming for solving Unit Commitment problem which encompass pre-dispatch and economic dispatch sub problems. The predispatch sub problem in UC is solved by unit classification based on Full Load Average production Cost. Solution for second sub problem is obtained using the modified form of DP. Modified form of dynamic programming technique suggested by this paper provides the generation schedule of individual generators in an analytical form even for a large number of variables without the traditional Lagrangian form. 10-generator system is tested using this algorithm for 24-hour scheduling horizon and the test result is compared with various other techniques. The result analysis exhibit the superiority of the proposed method.\",\"PeriodicalId\":305797,\"journal\":{\"name\":\"2011 INTERNATIONAL CONFERENCE ON RECENT ADVANCEMENTS IN ELECTRICAL, ELECTRONICS AND CONTROL ENGINEERING\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 INTERNATIONAL CONFERENCE ON RECENT ADVANCEMENTS IN ELECTRICAL, ELECTRONICS AND CONTROL ENGINEERING\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICONRAEECE.2011.6129807\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 INTERNATIONAL CONFERENCE ON RECENT ADVANCEMENTS IN ELECTRICAL, ELECTRONICS AND CONTROL ENGINEERING","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICONRAEECE.2011.6129807","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

本文提出了一种改进的动态规划形式,用于解决包含预调度和经济调度子问题的机组承诺问题。采用基于满负荷平均生产成本的单元分类方法解决了协同作业中的预调度子问题。利用改进的DP形式,得到了第二个子问题的解。本文提出的改进形式的动态规划技术,在没有传统拉格朗日形式的情况下,即使对于大量变量,也能以解析形式给出单个发生器的生成计划。利用该算法对10台发电机组进行了24小时调度水平的测试,并将测试结果与其他各种技术进行了比较。结果分析表明了该方法的优越性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Thermal Unit Commitment using FLAC guided modified dynamic programming approach
This paper presents a modified form of Dynamic Programming for solving Unit Commitment problem which encompass pre-dispatch and economic dispatch sub problems. The predispatch sub problem in UC is solved by unit classification based on Full Load Average production Cost. Solution for second sub problem is obtained using the modified form of DP. Modified form of dynamic programming technique suggested by this paper provides the generation schedule of individual generators in an analytical form even for a large number of variables without the traditional Lagrangian form. 10-generator system is tested using this algorithm for 24-hour scheduling horizon and the test result is compared with various other techniques. The result analysis exhibit the superiority of the proposed method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信