大型圆柱体码头壁稳定性评价

Jian-Min Zhang, Jianhong Zhang, Gang Wang, Yang Chen
{"title":"大型圆柱体码头壁稳定性评价","authors":"Jian-Min Zhang, Jianhong Zhang, Gang Wang, Yang Chen","doi":"10.2174/1874835X01003010069","DOIUrl":null,"url":null,"abstract":"The stability of the quay wall incorporating large diameter cylinders is of great concern at the Yangshan Port, China, owing to severe marine environment. In this study, finite element analysis is carried out to evaluate the stability of a trial quay wall during construction. The single cylinder is examined in terms of turnover failure subjected to a five year design wave action. The case when the cylinder is empty is the critical situation during construction. Filling the cylinder right after the installation is an effective way to increase the stability. After the quay wall has been formed by joining the single cylinders, the safety against overturning is reevaluated. The factor of safety of the quay wall is assessed to be 1.5 under a fifty year design wave action.","PeriodicalId":206173,"journal":{"name":"The Open Ocean Engineering Journal","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-02-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Stability Evaluation of a Quay Wall of Large Cylinders\",\"authors\":\"Jian-Min Zhang, Jianhong Zhang, Gang Wang, Yang Chen\",\"doi\":\"10.2174/1874835X01003010069\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The stability of the quay wall incorporating large diameter cylinders is of great concern at the Yangshan Port, China, owing to severe marine environment. In this study, finite element analysis is carried out to evaluate the stability of a trial quay wall during construction. The single cylinder is examined in terms of turnover failure subjected to a five year design wave action. The case when the cylinder is empty is the critical situation during construction. Filling the cylinder right after the installation is an effective way to increase the stability. After the quay wall has been formed by joining the single cylinders, the safety against overturning is reevaluated. The factor of safety of the quay wall is assessed to be 1.5 under a fifty year design wave action.\",\"PeriodicalId\":206173,\"journal\":{\"name\":\"The Open Ocean Engineering Journal\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-02-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Open Ocean Engineering Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2174/1874835X01003010069\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Open Ocean Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2174/1874835X01003010069","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

由于海洋环境恶劣,洋山港大直径圆柱码头墙的稳定性问题备受关注。本文采用有限元方法对某试验码头墙在施工过程中的稳定性进行了评价。对单缸在五年设计波作用下的翻转失效进行了检验。钢瓶空的情况是施工过程中的关键情况。安装后立即注满钢瓶是提高稳定性的有效方法。在通过连接单钢瓶形成码头墙后,重新评估其抗倾覆安全性。岸堤在50年设计波浪作用下的安全系数为1.5。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Stability Evaluation of a Quay Wall of Large Cylinders
The stability of the quay wall incorporating large diameter cylinders is of great concern at the Yangshan Port, China, owing to severe marine environment. In this study, finite element analysis is carried out to evaluate the stability of a trial quay wall during construction. The single cylinder is examined in terms of turnover failure subjected to a five year design wave action. The case when the cylinder is empty is the critical situation during construction. Filling the cylinder right after the installation is an effective way to increase the stability. After the quay wall has been formed by joining the single cylinders, the safety against overturning is reevaluated. The factor of safety of the quay wall is assessed to be 1.5 under a fifty year design wave action.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信