{"title":"Penerapan Agile Project Management Pada Pembuatan Sistem E-Warga Taman Cibodas Lippo Cikarang","authors":"Andre Elmustanizar","doi":"10.25134/nuansa.v16i1.4551","DOIUrl":null,"url":null,"abstract":"The implementation of E-Government technology in government at this time has not been evenly applied in all regions, especially in the lowest government, namely RT (Rukun Tetangga). Currently administrative services in the RT001 RW017 area of Taman Cibodas Lippo Cikarang Housing are still using conventional method, by utilizing the E-Warga system technology, it is expected to change the conventional and more efficient way. By using the Agile Management System method and the Scrum model framework, the creation of this E-Warga system will be faster in the manufacturing process because it divides the project into several parts called sprints. The results of the research show that the creation of the E-Warga system takes 8 weeks by dividing the time into 5 sprints. The evaluation of the sprint results is carried out after completing 1 sprint which has been determined by the priority scale previously. With the presence of the E-Warga system, RT management and residents can be faster and more efficient in administrative activities in the area of RT001 RW017, Taman Cibodas Housing, Lippo Cikarang.","PeriodicalId":214195,"journal":{"name":"NUANSA INFORMATIKA","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-01-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"NUANSA INFORMATIKA","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25134/nuansa.v16i1.4551","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Penerapan Agile Project Management Pada Pembuatan Sistem E-Warga Taman Cibodas Lippo Cikarang
The implementation of E-Government technology in government at this time has not been evenly applied in all regions, especially in the lowest government, namely RT (Rukun Tetangga). Currently administrative services in the RT001 RW017 area of Taman Cibodas Lippo Cikarang Housing are still using conventional method, by utilizing the E-Warga system technology, it is expected to change the conventional and more efficient way. By using the Agile Management System method and the Scrum model framework, the creation of this E-Warga system will be faster in the manufacturing process because it divides the project into several parts called sprints. The results of the research show that the creation of the E-Warga system takes 8 weeks by dividing the time into 5 sprints. The evaluation of the sprint results is carried out after completing 1 sprint which has been determined by the priority scale previously. With the presence of the E-Warga system, RT management and residents can be faster and more efficient in administrative activities in the area of RT001 RW017, Taman Cibodas Housing, Lippo Cikarang.