{"title":"并行机调度问题中系统可用性最大化的启发式算法","authors":"Asmaa Khoudi, A. Berrichi, F. Yalaoui","doi":"10.1109/ISPS.2015.7244995","DOIUrl":null,"url":null,"abstract":"This paper deals with a scheduling problem on Identical Parallel Machines where machines are subject to potentially costly failures. Failures can be avoided by an appropriate Preventive Maintenance (PM) planning. The preemption of production jobs is not allowed. The PM activities must be carried out by taking into consideration the production constraints. We assume that PM activities are performed after each job and they restore the machines to “as good as new” conditions. The objective is to find the best assignment of jobs on machines maximizing the system availability. We have proposed heuristics to deal with the problem. Experimental results are conducted to test the efficiency of our heuristics throughout 380 test problem instances.","PeriodicalId":165465,"journal":{"name":"2015 12th International Symposium on Programming and Systems (ISPS)","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-04-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Heuristics to maximize system availability on parallel machine scheduling problem\",\"authors\":\"Asmaa Khoudi, A. Berrichi, F. Yalaoui\",\"doi\":\"10.1109/ISPS.2015.7244995\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper deals with a scheduling problem on Identical Parallel Machines where machines are subject to potentially costly failures. Failures can be avoided by an appropriate Preventive Maintenance (PM) planning. The preemption of production jobs is not allowed. The PM activities must be carried out by taking into consideration the production constraints. We assume that PM activities are performed after each job and they restore the machines to “as good as new” conditions. The objective is to find the best assignment of jobs on machines maximizing the system availability. We have proposed heuristics to deal with the problem. Experimental results are conducted to test the efficiency of our heuristics throughout 380 test problem instances.\",\"PeriodicalId\":165465,\"journal\":{\"name\":\"2015 12th International Symposium on Programming and Systems (ISPS)\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-04-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 12th International Symposium on Programming and Systems (ISPS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISPS.2015.7244995\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 12th International Symposium on Programming and Systems (ISPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISPS.2015.7244995","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文研究了在同一并行机器上的调度问题,其中机器可能会发生代价高昂的故障。通过适当的预防性维护(PM)计划可以避免故障。不允许抢占生产作业。项目管理活动的实施必须考虑到生产约束条件。我们假设在每个作业之后执行PM活动,并且它们将机器恢复到“像新的一样好”的状态。目标是在机器上找到作业的最佳分配,使系统可用性最大化。我们提出了启发式方法来处理这个问题。实验结果通过380个测试问题实例验证了启发式算法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Heuristics to maximize system availability on parallel machine scheduling problem
This paper deals with a scheduling problem on Identical Parallel Machines where machines are subject to potentially costly failures. Failures can be avoided by an appropriate Preventive Maintenance (PM) planning. The preemption of production jobs is not allowed. The PM activities must be carried out by taking into consideration the production constraints. We assume that PM activities are performed after each job and they restore the machines to “as good as new” conditions. The objective is to find the best assignment of jobs on machines maximizing the system availability. We have proposed heuristics to deal with the problem. Experimental results are conducted to test the efficiency of our heuristics throughout 380 test problem instances.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信