在存在冲突的情况下生成测试计划和并发调度测试

T. C. Wilson, A. Basu, D. Banerji, J. Majithia
{"title":"在存在冲突的情况下生成测试计划和并发调度测试","authors":"T. C. Wilson, A. Basu, D. Banerji, J. Majithia","doi":"10.1109/GLSV.1991.143973","DOIUrl":null,"url":null,"abstract":"When BILBO tests are being generated and scheduled, resource conflicts between I-paths and tests present many difficulties. The authors explore: how pipelining is limited by potential internal conflicts; ways to promote pipelining during test plan generation and how to incorporate a test into a test phase already containing tests that conflict with it. They do not directly address the general problems of test plan generation or test scheduling. What is offered is insight into the difficulties that (potential) conflicts provide and techniques for handling these difficulties. The insights are primarily theoretical, but the resulting techniques could be viewed as possible extensions to existing methodologies.<<ETX>>","PeriodicalId":261873,"journal":{"name":"[1991] Proceedings. First Great Lakes Symposium on VLSI","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1991-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Test plan generation and concurrent scheduling of tests in the presence of conflicts\",\"authors\":\"T. C. Wilson, A. Basu, D. Banerji, J. Majithia\",\"doi\":\"10.1109/GLSV.1991.143973\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"When BILBO tests are being generated and scheduled, resource conflicts between I-paths and tests present many difficulties. The authors explore: how pipelining is limited by potential internal conflicts; ways to promote pipelining during test plan generation and how to incorporate a test into a test phase already containing tests that conflict with it. They do not directly address the general problems of test plan generation or test scheduling. What is offered is insight into the difficulties that (potential) conflicts provide and techniques for handling these difficulties. The insights are primarily theoretical, but the resulting techniques could be viewed as possible extensions to existing methodologies.<<ETX>>\",\"PeriodicalId\":261873,\"journal\":{\"name\":\"[1991] Proceedings. First Great Lakes Symposium on VLSI\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"[1991] Proceedings. First Great Lakes Symposium on VLSI\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/GLSV.1991.143973\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"[1991] Proceedings. First Great Lakes Symposium on VLSI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/GLSV.1991.143973","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

当生成和调度BILBO测试时,i路径和测试之间的资源冲突会带来很多困难。作者探讨了:流水线如何受到潜在内部冲突的限制;在测试计划生成期间促进流水线的方法,以及如何将测试合并到已经包含与之冲突的测试的测试阶段。它们不直接处理测试计划生成或测试调度的一般问题。所提供的是对(潜在)冲突提供的困难和处理这些困难的技术的洞察。这些见解主要是理论上的,但由此产生的技术可以被视为对现有方法的可能扩展
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Test plan generation and concurrent scheduling of tests in the presence of conflicts
When BILBO tests are being generated and scheduled, resource conflicts between I-paths and tests present many difficulties. The authors explore: how pipelining is limited by potential internal conflicts; ways to promote pipelining during test plan generation and how to incorporate a test into a test phase already containing tests that conflict with it. They do not directly address the general problems of test plan generation or test scheduling. What is offered is insight into the difficulties that (potential) conflicts provide and techniques for handling these difficulties. The insights are primarily theoretical, but the resulting techniques could be viewed as possible extensions to existing methodologies.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信