Nicole Wee Zhen Zhi, Low Wai Wah, Wong Shi Yee, Wong Kwong Soon
{"title":"马来西亚建筑项目实施工业革命4.0的绩效影响和障碍","authors":"Nicole Wee Zhen Zhi, Low Wai Wah, Wong Shi Yee, Wong Kwong Soon","doi":"10.24191/myse.v9i1.17302","DOIUrl":null,"url":null,"abstract":"Malaysian construction industry is still lagging in new technology adoption, while the world is moving towards Industrial Revolution 4.0 (IR 4.0). This study aims to identify the critical barriers of hindering the implementation of IR 4.0 among stakeholders in construction industry by using a set of questionnaires. The impacts of IR 4.0 to construction industry were also studied. The quantitative data were analysed using Relative Importance Index. The data revealed that the top barriers were related to technology deficiency and financial issue, while the greatest impacts of IR 4.0 implementation on project performance were safety, project success and time performance. The future of construction industry moving towards a fully digitalization is promising, although a longer time is required to achieve the desired status.","PeriodicalId":194704,"journal":{"name":"Malaysian Journal of Sustainable Environment","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-02-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"IMPACT OF PERFORMANCE AND BARRIERS TOWARDS INDUSTRIAL REVOLUTION 4.0 IMPLEMENTATION IN MALAYSIAN CONSTRUCTION PROJECTS\",\"authors\":\"Nicole Wee Zhen Zhi, Low Wai Wah, Wong Shi Yee, Wong Kwong Soon\",\"doi\":\"10.24191/myse.v9i1.17302\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Malaysian construction industry is still lagging in new technology adoption, while the world is moving towards Industrial Revolution 4.0 (IR 4.0). This study aims to identify the critical barriers of hindering the implementation of IR 4.0 among stakeholders in construction industry by using a set of questionnaires. The impacts of IR 4.0 to construction industry were also studied. The quantitative data were analysed using Relative Importance Index. The data revealed that the top barriers were related to technology deficiency and financial issue, while the greatest impacts of IR 4.0 implementation on project performance were safety, project success and time performance. The future of construction industry moving towards a fully digitalization is promising, although a longer time is required to achieve the desired status.\",\"PeriodicalId\":194704,\"journal\":{\"name\":\"Malaysian Journal of Sustainable Environment\",\"volume\":\"37 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-02-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Malaysian Journal of Sustainable Environment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24191/myse.v9i1.17302\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Malaysian Journal of Sustainable Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24191/myse.v9i1.17302","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
摘要
马来西亚建筑业在采用新技术方面仍然落后,而世界正在走向工业革命4.0 (IR 4.0)。本研究旨在通过一套问卷调查,找出阻碍建筑行业利益相关者实施工业4.0的关键障碍。研究了工业4.0对建筑业的影响。定量数据采用相对重要性指数进行分析。数据显示,最大的障碍与技术不足和财务问题有关,而实施工业4.0对项目绩效的最大影响是安全、项目成功和时间绩效。建筑行业走向完全数字化的未来是有希望的,尽管需要更长的时间才能达到预期的状态。
IMPACT OF PERFORMANCE AND BARRIERS TOWARDS INDUSTRIAL REVOLUTION 4.0 IMPLEMENTATION IN MALAYSIAN CONSTRUCTION PROJECTS
Malaysian construction industry is still lagging in new technology adoption, while the world is moving towards Industrial Revolution 4.0 (IR 4.0). This study aims to identify the critical barriers of hindering the implementation of IR 4.0 among stakeholders in construction industry by using a set of questionnaires. The impacts of IR 4.0 to construction industry were also studied. The quantitative data were analysed using Relative Importance Index. The data revealed that the top barriers were related to technology deficiency and financial issue, while the greatest impacts of IR 4.0 implementation on project performance were safety, project success and time performance. The future of construction industry moving towards a fully digitalization is promising, although a longer time is required to achieve the desired status.