J. Helguero, Santiago Galeano, A. Rosin, H. Biechl
{"title":"在低压电网中,纳米电网作为拓扑电厂的一部分提供无功功率","authors":"J. Helguero, Santiago Galeano, A. Rosin, H. Biechl","doi":"10.1109/SEST48500.2020.9203456","DOIUrl":null,"url":null,"abstract":"This research work presents an operation mechanism for supplying a scheduled value of reactive power at the medium voltage (MV) side of the distribution transformer by a group of interlinked nanogrids in the low voltage level (LV), which are part of a topological power plant (TPP). The operation mechanism takes into account the self-consumption of the nanogrid and network constraints, such as the permissible voltage band for each node and the loading of the transformer as well as cables. Furthermore, the minimization of active power losses within the TPP is taken into consideration while the scheduled reactive power at the MV side should be accomplished.","PeriodicalId":302157,"journal":{"name":"2020 International Conference on Smart Energy Systems and Technologies (SEST)","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Provision of Reactive Power by Nanogrids as part of a Topological Power Plant in a Low Voltage Network\",\"authors\":\"J. Helguero, Santiago Galeano, A. Rosin, H. Biechl\",\"doi\":\"10.1109/SEST48500.2020.9203456\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This research work presents an operation mechanism for supplying a scheduled value of reactive power at the medium voltage (MV) side of the distribution transformer by a group of interlinked nanogrids in the low voltage level (LV), which are part of a topological power plant (TPP). The operation mechanism takes into account the self-consumption of the nanogrid and network constraints, such as the permissible voltage band for each node and the loading of the transformer as well as cables. Furthermore, the minimization of active power losses within the TPP is taken into consideration while the scheduled reactive power at the MV side should be accomplished.\",\"PeriodicalId\":302157,\"journal\":{\"name\":\"2020 International Conference on Smart Energy Systems and Technologies (SEST)\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 International Conference on Smart Energy Systems and Technologies (SEST)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SEST48500.2020.9203456\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Conference on Smart Energy Systems and Technologies (SEST)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SEST48500.2020.9203456","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Provision of Reactive Power by Nanogrids as part of a Topological Power Plant in a Low Voltage Network
This research work presents an operation mechanism for supplying a scheduled value of reactive power at the medium voltage (MV) side of the distribution transformer by a group of interlinked nanogrids in the low voltage level (LV), which are part of a topological power plant (TPP). The operation mechanism takes into account the self-consumption of the nanogrid and network constraints, such as the permissible voltage band for each node and the loading of the transformer as well as cables. Furthermore, the minimization of active power losses within the TPP is taken into consideration while the scheduled reactive power at the MV side should be accomplished.