Monika Pradziadowicz
{"title":"Wybrane działania w ramach PROW 2007-2013 na przykładzie województwa zachodniopomorskiego","authors":"Monika Pradziadowicz","doi":"10.14595/PIES/01/010","DOIUrl":null,"url":null,"abstract":"This article presents three selected “Functionalities” within two axes: Axis 1 and Axis 3, which are terms to be implemented by the Rural Development Programme 2007-2013. The framework of Axis 1 shows the operation 125, in particular, Scheme II - management of agricultural water resources, while Axis 3 discusses the basic services for the economy and rural population and village renewal and development, also shown is the status of implementation of the various measures implemented in Axis 1 and Axis 3, based on data from 2013. For the implementation of the RDP 2007-2013, the European Union provided in the budget for Poland amount of over  17 billion euros, and national co-financing amounts to about 4 billion euros. The main tasks of the Programme is to support the modernization and improvement of the competitiveness of the agri-food sector and rural development. As part of the RDP 2007-2013 activities 125 will be implemented, in the majority relating to the construction or renovation of basic water management facilities. As part of operation 321 mainly activities of production and distribution of energy from renewable sources will be implemented. Action 313/322/323 refers to the construction and modernization and equipment of buildings serving as recreational, sporting, social, cultural, sports facilities, playgrounds and landscape architecture.The primary source of data presented in the tabular part are from material stored in the Management Information System of ARMA.","PeriodicalId":243710,"journal":{"name":"Progress in Economic Sciences","volume":"79 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Progress in Economic Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14595/PIES/01/010","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了两个轴(轴1和轴3)内的三个选定的“功能”,这是2007-2013年农村发展计划实施的术语。轴1的框架显示了操作125,特别是方案II -农业水资源管理,而轴3讨论了经济,农村人口和村庄更新与发展的基本服务,也显示了轴1和轴3中实施的各种措施的实施情况,基于2013年的数据。为实施2007-2013年的RDP,欧盟在预算中为波兰提供了超过170亿欧元的资金,国家共同融资约为40亿欧元。该方案的主要任务是支持农业粮食部门的现代化和提高竞争力以及农村发展。作为2007-2013年区域发展规划活动的一部分,将执行125项活动,其中大多数与基本水管理设施的建设或翻新有关。作为321号行动的一部分,将主要实施可再生能源的生产和分配活动。行动313/322/323是指作为娱乐、体育、社会、文化、体育设施、游乐场和景观建筑的建筑物的建设和现代化和设备。表格部分的数据主要来源于ARMA管理信息系统中存储的资料。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Wybrane działania w ramach PROW 2007-2013 na przykładzie województwa zachodniopomorskiego
This article presents three selected “Functionalities” within two axes: Axis 1 and Axis 3, which are terms to be implemented by the Rural Development Programme 2007-2013. The framework of Axis 1 shows the operation 125, in particular, Scheme II - management of agricultural water resources, while Axis 3 discusses the basic services for the economy and rural population and village renewal and development, also shown is the status of implementation of the various measures implemented in Axis 1 and Axis 3, based on data from 2013. For the implementation of the RDP 2007-2013, the European Union provided in the budget for Poland amount of over  17 billion euros, and national co-financing amounts to about 4 billion euros. The main tasks of the Programme is to support the modernization and improvement of the competitiveness of the agri-food sector and rural development. As part of the RDP 2007-2013 activities 125 will be implemented, in the majority relating to the construction or renovation of basic water management facilities. As part of operation 321 mainly activities of production and distribution of energy from renewable sources will be implemented. Action 313/322/323 refers to the construction and modernization and equipment of buildings serving as recreational, sporting, social, cultural, sports facilities, playgrounds and landscape architecture.The primary source of data presented in the tabular part are from material stored in the Management Information System of ARMA.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信