时变负荷下变电站送电点可靠性评估

P. Suwantawat, S. Premrudeepreechacharn
{"title":"时变负荷下变电站送电点可靠性评估","authors":"P. Suwantawat, S. Premrudeepreechacharn","doi":"10.1109/DRPT.2004.1338055","DOIUrl":null,"url":null,"abstract":"This paper presents a development of substation reliability evaluation by using the sequential Monte Carlo simulation method with time varying load at each delivery point. The technique is illustrated by application to a practical bus arrangement of substation and used to study the sensitivity analysis by varying selected station component parameters. The study results are essential to the condition base maintenance management planning and can play a great role in decision making for improving in main or sub equipment of substation component. It was shown that the Monte Carlo simulation method, which has gained popularity in recent year due to its simplicity and widely use in application to obtain more various indices than analytical method is nearest the real condition of substation, so this approach is a powerful tool for substation reliability evaluation. The results presented in this paper provide valuable information for planning, operation and maintenance of a substation.","PeriodicalId":427228,"journal":{"name":"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-04-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Reliability evaluation of substation delivery point with time varying load\",\"authors\":\"P. Suwantawat, S. Premrudeepreechacharn\",\"doi\":\"10.1109/DRPT.2004.1338055\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a development of substation reliability evaluation by using the sequential Monte Carlo simulation method with time varying load at each delivery point. The technique is illustrated by application to a practical bus arrangement of substation and used to study the sensitivity analysis by varying selected station component parameters. The study results are essential to the condition base maintenance management planning and can play a great role in decision making for improving in main or sub equipment of substation component. It was shown that the Monte Carlo simulation method, which has gained popularity in recent year due to its simplicity and widely use in application to obtain more various indices than analytical method is nearest the real condition of substation, so this approach is a powerful tool for substation reliability evaluation. The results presented in this paper provide valuable information for planning, operation and maintenance of a substation.\",\"PeriodicalId\":427228,\"journal\":{\"name\":\"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings\",\"volume\":\"48 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-04-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/DRPT.2004.1338055\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DRPT.2004.1338055","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

本文介绍了采用时序蒙特卡罗仿真方法对变电站可靠性进行时变负荷评估的发展。通过对某变电站母线布置的实际应用,说明了该方法的可行性,并应用于改变所选站部件参数的灵敏度分析研究。研究结果对状态基检修管理规划具有重要意义,对变电站部件主、副设备的改进具有重要的决策作用。结果表明,蒙特卡罗仿真方法比解析法获得的指标更接近变电站的真实情况,是近年来得到广泛应用的一种简便易行的方法,是变电站可靠性评估的有力工具。本文的研究结果为变电站的规划、运行和维护提供了有价值的信息。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Reliability evaluation of substation delivery point with time varying load
This paper presents a development of substation reliability evaluation by using the sequential Monte Carlo simulation method with time varying load at each delivery point. The technique is illustrated by application to a practical bus arrangement of substation and used to study the sensitivity analysis by varying selected station component parameters. The study results are essential to the condition base maintenance management planning and can play a great role in decision making for improving in main or sub equipment of substation component. It was shown that the Monte Carlo simulation method, which has gained popularity in recent year due to its simplicity and widely use in application to obtain more various indices than analytical method is nearest the real condition of substation, so this approach is a powerful tool for substation reliability evaluation. The results presented in this paper provide valuable information for planning, operation and maintenance of a substation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信