{"title":"公共采购在建设中实施循环经济中的作用","authors":"E. Plebankiewicz","doi":"10.37105/iboa.160","DOIUrl":null,"url":null,"abstract":"The aim of this paper is to analyse how Polish procurers are taking advantage of the opportunities for the development of the circular economy offered by the tools available through public procurement. Appropriate regulations to support the implementation of circular concepts in construction do exist, an example being the regulation governing the determination of life-cycle costs of buildings. However, it is not used by contracting authorities. The reasons for this can probably be found in the range of data that must be prepared in the contract documents in order to correctly calculate the individual values. At the same time, the regulation leaves little room for action by contractors, who can only propose extended guarantee periods and lower energy consumption.","PeriodicalId":227499,"journal":{"name":"Inżynieria Bezpieczeństwa Obiektów Antropogenicznych","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The role of public procurement in implementing the circular economy in construction\",\"authors\":\"E. Plebankiewicz\",\"doi\":\"10.37105/iboa.160\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The aim of this paper is to analyse how Polish procurers are taking advantage of the opportunities for the development of the circular economy offered by the tools available through public procurement. Appropriate regulations to support the implementation of circular concepts in construction do exist, an example being the regulation governing the determination of life-cycle costs of buildings. However, it is not used by contracting authorities. The reasons for this can probably be found in the range of data that must be prepared in the contract documents in order to correctly calculate the individual values. At the same time, the regulation leaves little room for action by contractors, who can only propose extended guarantee periods and lower energy consumption.\",\"PeriodicalId\":227499,\"journal\":{\"name\":\"Inżynieria Bezpieczeństwa Obiektów Antropogenicznych\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Inżynieria Bezpieczeństwa Obiektów Antropogenicznych\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37105/iboa.160\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Inżynieria Bezpieczeństwa Obiektów Antropogenicznych","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37105/iboa.160","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文的目的是分析波兰采购商如何利用通过公共采购提供的工具为循环经济发展提供的机会。支持在建筑中实施循环概念的适当条例确实存在,例如关于确定建筑物生命周期成本的条例。然而,它不被缔约当局使用。这样做的原因可能在合同文件中必须准备的数据范围中找到,以便正确计算单个值。与此同时,这项规定给承包商留下的行动空间很小,他们只能提出延长保修期和降低能耗的建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The role of public procurement in implementing the circular economy in construction
The aim of this paper is to analyse how Polish procurers are taking advantage of the opportunities for the development of the circular economy offered by the tools available through public procurement. Appropriate regulations to support the implementation of circular concepts in construction do exist, an example being the regulation governing the determination of life-cycle costs of buildings. However, it is not used by contracting authorities. The reasons for this can probably be found in the range of data that must be prepared in the contract documents in order to correctly calculate the individual values. At the same time, the regulation leaves little room for action by contractors, who can only propose extended guarantee periods and lower energy consumption.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信