伊朗电网最优供电问题的分层规划建模

R. T. Aminlouei, S. Ghaderi
{"title":"伊朗电网最优供电问题的分层规划建模","authors":"R. T. Aminlouei, S. Ghaderi","doi":"10.1109/EPEC.2010.5697176","DOIUrl":null,"url":null,"abstract":"In real power systems, power plants are not in the equal space from the load center, and their fuel cost is different. With common utilization conditions, production capacity is more than total load demand and losses. Therefore, there are different criteria for active and inactive power planning in each power plant. The best selection is to choose a frame work in which the utility cost is minimized. On the other hand, planning in power systems has different time horizons, thus, for effective planning in power systems, it is very important to find a suitable mathematical relationship between them. In this paper we propose a modeling by selecting a Fuzzy Hierarchical Production Planning (FHPP) technique with zone covering in the mid-term and long-term time horizons electricity supply modeling in the Iran global compact network with spotting 15 zone electricity study, in terms of inclusive capacity, Max development, Max energy product of each production unit, reliability and autonomy constraints. Other objective functions include parameters that minimize production, development and security costs of the system considering capital recovery factor, interest rate that maximize total preference weights of power plants.","PeriodicalId":393869,"journal":{"name":"2010 IEEE Electrical Power & Energy Conference","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Modeling of optimal electricity supply problem in Iran's power network by using hierarchical planning approach\",\"authors\":\"R. T. Aminlouei, S. Ghaderi\",\"doi\":\"10.1109/EPEC.2010.5697176\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In real power systems, power plants are not in the equal space from the load center, and their fuel cost is different. With common utilization conditions, production capacity is more than total load demand and losses. Therefore, there are different criteria for active and inactive power planning in each power plant. The best selection is to choose a frame work in which the utility cost is minimized. On the other hand, planning in power systems has different time horizons, thus, for effective planning in power systems, it is very important to find a suitable mathematical relationship between them. In this paper we propose a modeling by selecting a Fuzzy Hierarchical Production Planning (FHPP) technique with zone covering in the mid-term and long-term time horizons electricity supply modeling in the Iran global compact network with spotting 15 zone electricity study, in terms of inclusive capacity, Max development, Max energy product of each production unit, reliability and autonomy constraints. Other objective functions include parameters that minimize production, development and security costs of the system considering capital recovery factor, interest rate that maximize total preference weights of power plants.\",\"PeriodicalId\":393869,\"journal\":{\"name\":\"2010 IEEE Electrical Power & Energy Conference\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 IEEE Electrical Power & Energy Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPEC.2010.5697176\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE Electrical Power & Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPEC.2010.5697176","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在实际的电力系统中,电厂与负荷中心的距离并不相等,其燃料成本也不相同。在一般利用条件下,生产能力大于总负荷需求和损失。因此,每个电厂的有功和无功规划标准不同。最好的选择是选择一个实用成本最小的框架。另一方面,电力系统的规划具有不同的时间范围,因此,为了进行有效的电力系统规划,寻找合适的时间范围之间的数学关系是非常重要的。本文采用模糊分层生产计划(FHPP)技术对伊朗全球紧密型电网中长期电力供应模型进行建模,并结合15个区域电力研究,考虑各生产单元的包容能力、最大发展、最大能源产品、可靠性和自主性约束。其他目标函数包括考虑资金回收系数使系统的生产、开发和安全成本最小化的参数,使发电厂的总优先权重最大化的利率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Modeling of optimal electricity supply problem in Iran's power network by using hierarchical planning approach
In real power systems, power plants are not in the equal space from the load center, and their fuel cost is different. With common utilization conditions, production capacity is more than total load demand and losses. Therefore, there are different criteria for active and inactive power planning in each power plant. The best selection is to choose a frame work in which the utility cost is minimized. On the other hand, planning in power systems has different time horizons, thus, for effective planning in power systems, it is very important to find a suitable mathematical relationship between them. In this paper we propose a modeling by selecting a Fuzzy Hierarchical Production Planning (FHPP) technique with zone covering in the mid-term and long-term time horizons electricity supply modeling in the Iran global compact network with spotting 15 zone electricity study, in terms of inclusive capacity, Max development, Max energy product of each production unit, reliability and autonomy constraints. Other objective functions include parameters that minimize production, development and security costs of the system considering capital recovery factor, interest rate that maximize total preference weights of power plants.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信