{"title":"“零伤害”安全项目的实施与当前建筑行业财务风险管理的成功案例","authors":"T. Crangle","doi":"10.1109/TDCLLM.1998.668339","DOIUrl":null,"url":null,"abstract":"The purpose of this paper is to describe: results of research done by Clemson University for the Construction Industry Institute (CII) through the Zero Injury Task Force; successful implementation of Zero Injury Safety Program in the Tennessee Valley Authority Division of Transmission Construction where a Zero Injury Goal (Zero Lost Workday Case Incident Rate) was achieved and sustained for 2 1/2 years; and the latest in financial and construction risk management in the construction industry and applied to electric utility transmission construction, operation, and maintenance using inhouse and contract forces.","PeriodicalId":328713,"journal":{"name":"ESMO '98 - 1998 IEEE 8th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance Proceedings ESMO '98 Proceedings. ESMO 98 The Power is in Your Hand","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"\\\"Zero Injury\\\" safety program implementation as related to current construction industry financial risk management: a success story\",\"authors\":\"T. Crangle\",\"doi\":\"10.1109/TDCLLM.1998.668339\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this paper is to describe: results of research done by Clemson University for the Construction Industry Institute (CII) through the Zero Injury Task Force; successful implementation of Zero Injury Safety Program in the Tennessee Valley Authority Division of Transmission Construction where a Zero Injury Goal (Zero Lost Workday Case Incident Rate) was achieved and sustained for 2 1/2 years; and the latest in financial and construction risk management in the construction industry and applied to electric utility transmission construction, operation, and maintenance using inhouse and contract forces.\",\"PeriodicalId\":328713,\"journal\":{\"name\":\"ESMO '98 - 1998 IEEE 8th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance Proceedings ESMO '98 Proceedings. ESMO 98 The Power is in Your Hand\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ESMO '98 - 1998 IEEE 8th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance Proceedings ESMO '98 Proceedings. ESMO 98 The Power is in Your Hand\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDCLLM.1998.668339\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ESMO '98 - 1998 IEEE 8th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance Proceedings ESMO '98 Proceedings. ESMO 98 The Power is in Your Hand","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.1998.668339","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
"Zero Injury" safety program implementation as related to current construction industry financial risk management: a success story
The purpose of this paper is to describe: results of research done by Clemson University for the Construction Industry Institute (CII) through the Zero Injury Task Force; successful implementation of Zero Injury Safety Program in the Tennessee Valley Authority Division of Transmission Construction where a Zero Injury Goal (Zero Lost Workday Case Incident Rate) was achieved and sustained for 2 1/2 years; and the latest in financial and construction risk management in the construction industry and applied to electric utility transmission construction, operation, and maintenance using inhouse and contract forces.