{"title":"“零伤害”安全项目的实施与当前建筑行业财务风险管理的成功案例","authors":"T. Crangle","doi":"10.1109/TDCLLM.1998.668339","DOIUrl":null,"url":null,"abstract":"The purpose of this paper is to describe: results of research done by Clemson University for the Construction Industry Institute (CII) through the Zero Injury Task Force; successful implementation of Zero Injury Safety Program in the Tennessee Valley Authority Division of Transmission Construction where a Zero Injury Goal (Zero Lost Workday Case Incident Rate) was achieved and sustained for 2 1/2 years; and the latest in financial and construction risk management in the construction industry and applied to electric utility transmission construction, operation, and maintenance using inhouse and contract forces.","PeriodicalId":328713,"journal":{"name":"ESMO '98 - 1998 IEEE 8th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance Proceedings ESMO '98 Proceedings. ESMO 98 The Power is in Your Hand","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"\\\"Zero Injury\\\" safety program implementation as related to current construction industry financial risk management: a success story\",\"authors\":\"T. Crangle\",\"doi\":\"10.1109/TDCLLM.1998.668339\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this paper is to describe: results of research done by Clemson University for the Construction Industry Institute (CII) through the Zero Injury Task Force; successful implementation of Zero Injury Safety Program in the Tennessee Valley Authority Division of Transmission Construction where a Zero Injury Goal (Zero Lost Workday Case Incident Rate) was achieved and sustained for 2 1/2 years; and the latest in financial and construction risk management in the construction industry and applied to electric utility transmission construction, operation, and maintenance using inhouse and contract forces.\",\"PeriodicalId\":328713,\"journal\":{\"name\":\"ESMO '98 - 1998 IEEE 8th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance Proceedings ESMO '98 Proceedings. ESMO 98 The Power is in Your Hand\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ESMO '98 - 1998 IEEE 8th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance Proceedings ESMO '98 Proceedings. ESMO 98 The Power is in Your Hand\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDCLLM.1998.668339\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ESMO '98 - 1998 IEEE 8th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance Proceedings ESMO '98 Proceedings. ESMO 98 The Power is in Your Hand","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.1998.668339","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文的目的是描述:克莱姆森大学通过零伤害工作组为建筑工业研究所(CII)所做的研究结果;在田纳西河谷管理局输电建设部门成功实施了零伤害安全计划,实现了零伤害目标(零工作日损失事故发生率),并持续了两年半;并将最新的财务和施工风险管理应用于建筑行业,并将其应用于电力公用事业输变电施工、运营和维护中。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
"Zero Injury" safety program implementation as related to current construction industry financial risk management: a success story
The purpose of this paper is to describe: results of research done by Clemson University for the Construction Industry Institute (CII) through the Zero Injury Task Force; successful implementation of Zero Injury Safety Program in the Tennessee Valley Authority Division of Transmission Construction where a Zero Injury Goal (Zero Lost Workday Case Incident Rate) was achieved and sustained for 2 1/2 years; and the latest in financial and construction risk management in the construction industry and applied to electric utility transmission construction, operation, and maintenance using inhouse and contract forces.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信