PPP模式在城市轨道交通中的经济效果分析——以伦敦地铁和北京地铁4号线为例

Chen Liao
{"title":"PPP模式在城市轨道交通中的经济效果分析——以伦敦地铁和北京地铁4号线为例","authors":"Chen Liao","doi":"10.1109/IEIS.2016.7551885","DOIUrl":null,"url":null,"abstract":"Public Private Partnership is a new financing model and has been used in constructing public facilities. In this way, government attracts social capital to reduce the financial burden, enterprises earn revenue through private investment, and both of them ultimately achieve a win-win outcome. However, successful implementation of the PPP model requires us to balance many factors. This paper analyzes the failure of the London Underground PPP project and the success of Beijing Metro Line 4 and makes some suggestions, hoping that it can be served as a reference for the implementation of PPP projects in the future, better promoting the construction of public facilities.","PeriodicalId":334364,"journal":{"name":"2016 International Conference on Industrial Economics System and Industrial Security Engineering (IEIS)","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-07-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"The economic effect analysis of PPP model in urban rail transit — Illustrated by the London Underground and Beijing Metro Line 4\",\"authors\":\"Chen Liao\",\"doi\":\"10.1109/IEIS.2016.7551885\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Public Private Partnership is a new financing model and has been used in constructing public facilities. In this way, government attracts social capital to reduce the financial burden, enterprises earn revenue through private investment, and both of them ultimately achieve a win-win outcome. However, successful implementation of the PPP model requires us to balance many factors. This paper analyzes the failure of the London Underground PPP project and the success of Beijing Metro Line 4 and makes some suggestions, hoping that it can be served as a reference for the implementation of PPP projects in the future, better promoting the construction of public facilities.\",\"PeriodicalId\":334364,\"journal\":{\"name\":\"2016 International Conference on Industrial Economics System and Industrial Security Engineering (IEIS)\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-07-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 International Conference on Industrial Economics System and Industrial Security Engineering (IEIS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEIS.2016.7551885\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 International Conference on Industrial Economics System and Industrial Security Engineering (IEIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEIS.2016.7551885","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

公私合作是一种新型的融资模式,在公共设施建设中得到广泛应用。这样,政府吸引社会资本减轻财政负担,企业通过民间投资获得收益,最终达到双赢。然而,PPP模式的成功实施需要我们平衡许多因素。本文分析了伦敦地铁PPP项目的失败和北京地铁4号线的成功,并提出了一些建议,希望能为今后PPP项目的实施提供参考,更好地促进公共设施的建设。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The economic effect analysis of PPP model in urban rail transit — Illustrated by the London Underground and Beijing Metro Line 4
Public Private Partnership is a new financing model and has been used in constructing public facilities. In this way, government attracts social capital to reduce the financial burden, enterprises earn revenue through private investment, and both of them ultimately achieve a win-win outcome. However, successful implementation of the PPP model requires us to balance many factors. This paper analyzes the failure of the London Underground PPP project and the success of Beijing Metro Line 4 and makes some suggestions, hoping that it can be served as a reference for the implementation of PPP projects in the future, better promoting the construction of public facilities.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信