生产控制信息系统工具的研究与开发

Y. Ishii, S. Watanabe
{"title":"生产控制信息系统工具的研究与开发","authors":"Y. Ishii, S. Watanabe","doi":"10.1109/ISSM.2000.993685","DOIUrl":null,"url":null,"abstract":"It is necessary to obtain some types of information in real time to follow a production plan. To select necessary information, we created a production control business flow. As a result, we found out that there were two types of information that were necessary for production control. The information of first type is that of the difference between each planned stage move and actual stage move. As shown by the business flow, it is important to check the difference between the planned move and the actual move in real time and take quick action. The information of the second type is that of the causes of such difference, especially status information of the constraint equipment. We have established and operated a system that enables us to obtain such types of information and to take quick action to reduce the difference before the problem becomes serious.","PeriodicalId":104122,"journal":{"name":"Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130)","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-09-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Research and development of production control information system tool\",\"authors\":\"Y. Ishii, S. Watanabe\",\"doi\":\"10.1109/ISSM.2000.993685\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"It is necessary to obtain some types of information in real time to follow a production plan. To select necessary information, we created a production control business flow. As a result, we found out that there were two types of information that were necessary for production control. The information of first type is that of the difference between each planned stage move and actual stage move. As shown by the business flow, it is important to check the difference between the planned move and the actual move in real time and take quick action. The information of the second type is that of the causes of such difference, especially status information of the constraint equipment. We have established and operated a system that enables us to obtain such types of information and to take quick action to reduce the difference before the problem becomes serious.\",\"PeriodicalId\":104122,\"journal\":{\"name\":\"Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130)\",\"volume\":\"11 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-09-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISSM.2000.993685\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISSM.2000.993685","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

为了执行生产计划,实时获取某些类型的信息是必要的。为了选择必要的信息,我们创建了一个生产控制业务流。结果,我们发现有两种类型的信息是生产控制所必需的。第一类信息是每次计划阶段移动与实际阶段移动之间的差异。如业务流程所示,实时检查计划移动和实际移动之间的差异并迅速采取行动是很重要的。第二类信息是造成这种差异的原因信息,特别是约束设备的状态信息。我们已经建立并运行了一个系统,使我们能够获得这类信息,并迅速采取行动,在问题变得严重之前缩小差距。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research and development of production control information system tool
It is necessary to obtain some types of information in real time to follow a production plan. To select necessary information, we created a production control business flow. As a result, we found out that there were two types of information that were necessary for production control. The information of first type is that of the difference between each planned stage move and actual stage move. As shown by the business flow, it is important to check the difference between the planned move and the actual move in real time and take quick action. The information of the second type is that of the causes of such difference, especially status information of the constraint equipment. We have established and operated a system that enables us to obtain such types of information and to take quick action to reduce the difference before the problem becomes serious.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信