通过有效的项目管理减少开发时间和成本

D. Soldano
{"title":"通过有效的项目管理减少开发时间和成本","authors":"D. Soldano","doi":"10.1109/SOUTHC.1995.516108","DOIUrl":null,"url":null,"abstract":"The more complex a development effort the more difficult it is to reduce or control the project's schedule and cost. The use of concurrent engineering in the development cycle only exacerbates the problem by increasing the number of departments and people involved at any point in the development effort. Breakdowns in the process can have devastating effects on the project schedule and double or even triple the development cost. These project elements can be effectively controlled using proven project management techniques. A number of companies involved in complex development efforts have been able to greatly reduce both development time and cost by applying these techniques.","PeriodicalId":341055,"journal":{"name":"Proceedings of Southcon '95","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Reducing development time and cost through effective project management\",\"authors\":\"D. Soldano\",\"doi\":\"10.1109/SOUTHC.1995.516108\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The more complex a development effort the more difficult it is to reduce or control the project's schedule and cost. The use of concurrent engineering in the development cycle only exacerbates the problem by increasing the number of departments and people involved at any point in the development effort. Breakdowns in the process can have devastating effects on the project schedule and double or even triple the development cost. These project elements can be effectively controlled using proven project management techniques. A number of companies involved in complex development efforts have been able to greatly reduce both development time and cost by applying these techniques.\",\"PeriodicalId\":341055,\"journal\":{\"name\":\"Proceedings of Southcon '95\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of Southcon '95\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SOUTHC.1995.516108\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of Southcon '95","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SOUTHC.1995.516108","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

开发工作越复杂,就越难以减少或控制项目的进度和成本。在开发周期中使用并发工程只会增加开发工作中任何一点所涉及的部门和人员的数量,从而使问题恶化。过程中的故障会对项目进度产生破坏性影响,并使开发成本增加一倍甚至三倍。使用成熟的项目管理技术可以有效地控制这些项目元素。许多参与复杂开发工作的公司已经能够通过应用这些技术大大减少开发时间和成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Reducing development time and cost through effective project management
The more complex a development effort the more difficult it is to reduce or control the project's schedule and cost. The use of concurrent engineering in the development cycle only exacerbates the problem by increasing the number of departments and people involved at any point in the development effort. Breakdowns in the process can have devastating effects on the project schedule and double or even triple the development cost. These project elements can be effectively controlled using proven project management techniques. A number of companies involved in complex development efforts have been able to greatly reduce both development time and cost by applying these techniques.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信