{"title":"消除尼日利亚搁浅边缘油田伴生气火炬:Otakikpo油田战略","authors":"J. Akinyemi, Tamunotroko kala-otaji","doi":"10.2118/217128-ms","DOIUrl":null,"url":null,"abstract":"\n The Otakikpo marginal field was carved out of OML 11 and is situated in the southern part of the license. The field was discovered with Otakikpo-02 in 1983 and was further appraised with Otakikpo-03 in 1986. The wells encountered hydrocarbons in 4 stacked oil and gas bearing sands (C5000, C6000, C7000 and E1000). The field is operated by Green Energy International Limited (GEIL).\n The field currently produces ~10,500 bopd with significant associated gas (AG) production from the wells with average GOR of ~1000 scf/bbl. Compositional analysis shows that the associated gas is rich in C3 – C4 components (~ 8%) and C5 – C7 (~ 3%) making it ideal for NGLs (LPG and condensates) extractions.\n Most natural gas utilization projects require securing constant gas production contracts for between 10-20 years and for constant rates > 50 MMSCFD. However, the Otakikpo field, the associated gas reserves do not meet this threshold and the production profiles are at best unpredictable.\n To address these issues, an innovative strategy is required to accelerate reduction in the field's AG flaring. A qualitative and quantitative screening of the various gas utilization concepts against some critical decision drivers (AG production profile, scalability, CAPEX) led to the recommendation of a modular LPG extraction plant for the heavier components of the AG and Gas to Power for the lean gas.\n The conventional approach of piping gas from a remote field needs to be replaced with a less orthodox technique of \"bringing the plant to the gas\". This eliminates the need for expensive pipeline and compression since the facility is within the Otakikpo field flow station. Furthermore, a modular scalable strategy with small footprint plant that is quick to deploy and easy to relocate was recommended as the best solution for the field.\n The Operator successfully commissioned the 12MMSCFD modular LPG extraction plant and 6MW power generating plants. This scale of modular LPG plant will be the first to be installed in the country. This strategy could be adopted by other small fields in addressing AG flares caused by stranded pockets of gas located in oil fields in the Niger Delta thus supporting the Government's aspiration of eliminating AG flares.","PeriodicalId":407977,"journal":{"name":"Day 3 Wed, August 02, 2023","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Eliminating Associated Gas Flares in The Nigerian Stranded Marginal Field Oil Fields: The Otakikpo Field Strategy\",\"authors\":\"J. Akinyemi, Tamunotroko kala-otaji\",\"doi\":\"10.2118/217128-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The Otakikpo marginal field was carved out of OML 11 and is situated in the southern part of the license. The field was discovered with Otakikpo-02 in 1983 and was further appraised with Otakikpo-03 in 1986. The wells encountered hydrocarbons in 4 stacked oil and gas bearing sands (C5000, C6000, C7000 and E1000). The field is operated by Green Energy International Limited (GEIL).\\n The field currently produces ~10,500 bopd with significant associated gas (AG) production from the wells with average GOR of ~1000 scf/bbl. Compositional analysis shows that the associated gas is rich in C3 – C4 components (~ 8%) and C5 – C7 (~ 3%) making it ideal for NGLs (LPG and condensates) extractions.\\n Most natural gas utilization projects require securing constant gas production contracts for between 10-20 years and for constant rates > 50 MMSCFD. However, the Otakikpo field, the associated gas reserves do not meet this threshold and the production profiles are at best unpredictable.\\n To address these issues, an innovative strategy is required to accelerate reduction in the field's AG flaring. A qualitative and quantitative screening of the various gas utilization concepts against some critical decision drivers (AG production profile, scalability, CAPEX) led to the recommendation of a modular LPG extraction plant for the heavier components of the AG and Gas to Power for the lean gas.\\n The conventional approach of piping gas from a remote field needs to be replaced with a less orthodox technique of \\\"bringing the plant to the gas\\\". This eliminates the need for expensive pipeline and compression since the facility is within the Otakikpo field flow station. Furthermore, a modular scalable strategy with small footprint plant that is quick to deploy and easy to relocate was recommended as the best solution for the field.\\n The Operator successfully commissioned the 12MMSCFD modular LPG extraction plant and 6MW power generating plants. This scale of modular LPG plant will be the first to be installed in the country. This strategy could be adopted by other small fields in addressing AG flares caused by stranded pockets of gas located in oil fields in the Niger Delta thus supporting the Government's aspiration of eliminating AG flares.\",\"PeriodicalId\":407977,\"journal\":{\"name\":\"Day 3 Wed, August 02, 2023\",\"volume\":\"35 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, August 02, 2023\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/217128-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, August 02, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/217128-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Otakikpo边缘油田是从OML 11中开采出来的,位于许可证的南部。该油田于1983年与Otakikpo-02一起被发现,并于1986年与Otakikpo-03一起被进一步评价。这些井在C5000、C6000、C7000和E1000四个叠层含油气砂岩中发现了油气。该油田由绿色能源国际有限公司(GEIL)运营。该油田目前的产量约为10500桶/天,其中油井的伴生气产量显著,平均GOR约为1000立方英尺/桶。组份分析表明,伴生气富含C3 - C4组分(~ 8%)和C5 - C7组分(~ 3%),是提取液化石油气(LPG和凝析油)的理想选择。大多数天然气利用项目都需要签订10-20年的稳定产气合同,且固定产量大于50 MMSCFD。然而,Otakikpo气田的伴生气储量没有达到这一阈值,其生产剖面充其量是不可预测的。为了解决这些问题,需要一个创新的战略来加速减少油田的天然气燃烧。针对一些关键决策驱动因素(天然气生产概况、可扩展性、资本支出),对各种天然气利用概念进行了定性和定量筛选,最终建议采用模块化液化石油气萃取装置来处理天然气的较重组分,并将天然气转化为电力来处理贫气。从偏远地区输送天然气的传统方法需要被一种不太正统的技术所取代,即“把工厂带到天然气上”。由于该设施位于Otakikpo油田流站内,因此无需昂贵的管道和压缩。此外,模块化可扩展策略,占地面积小,可快速部署,易于搬迁,被推荐为该领域的最佳解决方案。运营商成功调试了12MMSCFD模块化液化石油气提取装置和6MW发电厂。这种规模的模块化液化石油气工厂将是该国第一个安装的工厂。其他小油田可以采用这一战略来解决尼日尔三角洲油田搁浅的天然气袋造成的天然气燃烧问题,从而支持政府消除天然气燃烧的愿望。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Eliminating Associated Gas Flares in The Nigerian Stranded Marginal Field Oil Fields: The Otakikpo Field Strategy
The Otakikpo marginal field was carved out of OML 11 and is situated in the southern part of the license. The field was discovered with Otakikpo-02 in 1983 and was further appraised with Otakikpo-03 in 1986. The wells encountered hydrocarbons in 4 stacked oil and gas bearing sands (C5000, C6000, C7000 and E1000). The field is operated by Green Energy International Limited (GEIL). The field currently produces ~10,500 bopd with significant associated gas (AG) production from the wells with average GOR of ~1000 scf/bbl. Compositional analysis shows that the associated gas is rich in C3 – C4 components (~ 8%) and C5 – C7 (~ 3%) making it ideal for NGLs (LPG and condensates) extractions. Most natural gas utilization projects require securing constant gas production contracts for between 10-20 years and for constant rates > 50 MMSCFD. However, the Otakikpo field, the associated gas reserves do not meet this threshold and the production profiles are at best unpredictable. To address these issues, an innovative strategy is required to accelerate reduction in the field's AG flaring. A qualitative and quantitative screening of the various gas utilization concepts against some critical decision drivers (AG production profile, scalability, CAPEX) led to the recommendation of a modular LPG extraction plant for the heavier components of the AG and Gas to Power for the lean gas. The conventional approach of piping gas from a remote field needs to be replaced with a less orthodox technique of "bringing the plant to the gas". This eliminates the need for expensive pipeline and compression since the facility is within the Otakikpo field flow station. Furthermore, a modular scalable strategy with small footprint plant that is quick to deploy and easy to relocate was recommended as the best solution for the field. The Operator successfully commissioned the 12MMSCFD modular LPG extraction plant and 6MW power generating plants. This scale of modular LPG plant will be the first to be installed in the country. This strategy could be adopted by other small fields in addressing AG flares caused by stranded pockets of gas located in oil fields in the Niger Delta thus supporting the Government's aspiration of eliminating AG flares.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信