高压接地系统部件全寿命成本分析

Christopher K. Shaw, D. Holm
{"title":"高压接地系统部件全寿命成本分析","authors":"Christopher K. Shaw, D. Holm","doi":"10.1109/td43745.2022.9816930","DOIUrl":null,"url":null,"abstract":"High voltage (HV) electrical installations require appropriately designed grounding systems to provide the necessary levels of safety and operational security. Grounding system installers and HV asset owners face continual pressure to lower cost, and the projectbased nature of construction work leads to a focus primarily on component cost rather than whole of life cost. However, where this pressure leads to the use of inferior components or installation methods, the safety outcomes will be impaired, and the whole of life cost may even be higher. This paper will explore the cost of various component groups in grounding systems of HV substations and lines, and present these in the context of both the asset and grounding system installation cost; and in proportion to the life-long cost of owning and managing the grounding system for a 30-year asset life. The costs from failure of components will also be explored.","PeriodicalId":241987,"journal":{"name":"2022 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","volume":"122 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Whole of Life Cost Analysis FOR Components OF High Voltage Grounding Systems\",\"authors\":\"Christopher K. Shaw, D. Holm\",\"doi\":\"10.1109/td43745.2022.9816930\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"High voltage (HV) electrical installations require appropriately designed grounding systems to provide the necessary levels of safety and operational security. Grounding system installers and HV asset owners face continual pressure to lower cost, and the projectbased nature of construction work leads to a focus primarily on component cost rather than whole of life cost. However, where this pressure leads to the use of inferior components or installation methods, the safety outcomes will be impaired, and the whole of life cost may even be higher. This paper will explore the cost of various component groups in grounding systems of HV substations and lines, and present these in the context of both the asset and grounding system installation cost; and in proportion to the life-long cost of owning and managing the grounding system for a 30-year asset life. The costs from failure of components will also be explored.\",\"PeriodicalId\":241987,\"journal\":{\"name\":\"2022 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"volume\":\"122 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-04-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/td43745.2022.9816930\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/td43745.2022.9816930","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

高压(HV)电气装置需要适当设计的接地系统,以提供必要的安全性和操作安全性。接地系统安装人员和高压资产所有者面临着降低成本的持续压力,建筑工作的项目性质导致主要关注组件成本,而不是整个生命周期的成本。然而,如果这种压力导致使用劣质部件或安装方法,则安全效果将受到损害,甚至可能导致更高的全寿命成本。本文将探讨高压变电站和线路接地系统中各组成部分的成本,并在资产和接地系统安装成本的背景下提出这些成本;在30年的资产寿命中,与拥有和管理接地系统的终身成本成比例。组件失效的成本也将被探讨。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Whole of Life Cost Analysis FOR Components OF High Voltage Grounding Systems
High voltage (HV) electrical installations require appropriately designed grounding systems to provide the necessary levels of safety and operational security. Grounding system installers and HV asset owners face continual pressure to lower cost, and the projectbased nature of construction work leads to a focus primarily on component cost rather than whole of life cost. However, where this pressure leads to the use of inferior components or installation methods, the safety outcomes will be impaired, and the whole of life cost may even be higher. This paper will explore the cost of various component groups in grounding systems of HV substations and lines, and present these in the context of both the asset and grounding system installation cost; and in proportion to the life-long cost of owning and managing the grounding system for a 30-year asset life. The costs from failure of components will also be explored.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信