{"title":"曼卡姆出版公司-处理双重?","authors":"Ingrid B. Splettstoesser, N. Waweru","doi":"10.1504/IJTCS.2017.10007753","DOIUrl":null,"url":null,"abstract":"Joe, the logistics director of a large niche publishing company in the USA, has received approval to implement a freight settlement system that will save his department and the company up to $2 million per year, while saving time and improving decision making in his department. Yet, during the analysis phase and before the actual implementation, Joe is informed that an ERP system is being implemented, and he will not be allocated IT resources for the FSS project. What should he do? Continue with the project, or wait until the ERP system has been put in place, given that ERP systems do not always get implemented on time?","PeriodicalId":253960,"journal":{"name":"International Journal of Teaching and Case Studies","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Mankham Publishing Company - dealing with doubles?\",\"authors\":\"Ingrid B. Splettstoesser, N. Waweru\",\"doi\":\"10.1504/IJTCS.2017.10007753\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Joe, the logistics director of a large niche publishing company in the USA, has received approval to implement a freight settlement system that will save his department and the company up to $2 million per year, while saving time and improving decision making in his department. Yet, during the analysis phase and before the actual implementation, Joe is informed that an ERP system is being implemented, and he will not be allocated IT resources for the FSS project. What should he do? Continue with the project, or wait until the ERP system has been put in place, given that ERP systems do not always get implemented on time?\",\"PeriodicalId\":253960,\"journal\":{\"name\":\"International Journal of Teaching and Case Studies\",\"volume\":\"35 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Teaching and Case Studies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJTCS.2017.10007753\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Teaching and Case Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJTCS.2017.10007753","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Mankham Publishing Company - dealing with doubles?
Joe, the logistics director of a large niche publishing company in the USA, has received approval to implement a freight settlement system that will save his department and the company up to $2 million per year, while saving time and improving decision making in his department. Yet, during the analysis phase and before the actual implementation, Joe is informed that an ERP system is being implemented, and he will not be allocated IT resources for the FSS project. What should he do? Continue with the project, or wait until the ERP system has been put in place, given that ERP systems do not always get implemented on time?