再生资源互联,老旧小水电厂改造新机遇

B. Radulescu, V. Radulescu
{"title":"再生资源互联,老旧小水电厂改造新机遇","authors":"B. Radulescu, V. Radulescu","doi":"10.1115/imece2021-70973","DOIUrl":null,"url":null,"abstract":"\n In Romania, before 1990, numerous small hydroelectric power plants - SHP were realized for the electrification of isolated areas or small communities. Since 2007, a new concept concerning the operational parameters and yields has been implemented, and the functional SHPs have been re-evaluated. A massive environmental data monitoring campaign has started, creating an economically appropriate SHP database that can be associated with another renewable resource. This paper presents such a pilot station, the first realized in Romania near the Arges River, SHP Budeasa, interconnected with a wind power plant. Some local conditions and part of the realized database are briefly presented. Due to the increase in local demand for electricity, it was necessary to rehabilitate this SHP by associating it with 2 other power plants based on renewable sources. Each component of the pilot station is analyzed separately. After the commissioning of the wind farm an additional production of electricity was obtained, and the pilot station became profitable. From these benefits, the rehabilitation of SHP Budeasa started. The theoretical model, the essential steps in the physical realization and necessary conditions for interconnection are mentioned. The results obtained after seven months of operation and some economic aspects are finally mentioned.","PeriodicalId":238134,"journal":{"name":"Volume 8B: Energy","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Interconnection of Renewable Resources, New Opportunity in the Rehabilitation of Old Small Hydropower Plant\",\"authors\":\"B. Radulescu, V. Radulescu\",\"doi\":\"10.1115/imece2021-70973\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n In Romania, before 1990, numerous small hydroelectric power plants - SHP were realized for the electrification of isolated areas or small communities. Since 2007, a new concept concerning the operational parameters and yields has been implemented, and the functional SHPs have been re-evaluated. A massive environmental data monitoring campaign has started, creating an economically appropriate SHP database that can be associated with another renewable resource. This paper presents such a pilot station, the first realized in Romania near the Arges River, SHP Budeasa, interconnected with a wind power plant. Some local conditions and part of the realized database are briefly presented. Due to the increase in local demand for electricity, it was necessary to rehabilitate this SHP by associating it with 2 other power plants based on renewable sources. Each component of the pilot station is analyzed separately. After the commissioning of the wind farm an additional production of electricity was obtained, and the pilot station became profitable. From these benefits, the rehabilitation of SHP Budeasa started. The theoretical model, the essential steps in the physical realization and necessary conditions for interconnection are mentioned. The results obtained after seven months of operation and some economic aspects are finally mentioned.\",\"PeriodicalId\":238134,\"journal\":{\"name\":\"Volume 8B: Energy\",\"volume\":\"36 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Volume 8B: Energy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1115/imece2021-70973\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 8B: Energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/imece2021-70973","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

1990年以前,罗马尼亚建成了许多小型水力发电厂,用于偏远地区或小社区的电气化。自2007年以来,实施了有关操作参数和产量的新概念,并重新评估了功能性SHPs。一项大规模的环境数据监测运动已经开始,建立了一个经济上适当的可与另一种可再生资源相联系的水力发电数据库。本文介绍了这样一个试验站,这是罗马尼亚在阿尔日河附近实现的第一个试验站,SHP Budeasa,与风力发电厂互联。简要介绍了该数据库的一些局部条件和部分实现情况。由于当地电力需求的增加,有必要通过与其他两个基于可再生能源的发电厂联合来修复该SHP。对导频站的各个组成部分分别进行了分析。风电场投产后,获得了额外的发电量,试验站开始盈利。从这些好处开始,布迪阿萨轮船的修复工作开始了。介绍了互连的理论模型、物理实现的基本步骤和互连的必要条件。最后介绍了该装置运行7个月后取得的效果和一些经济方面的情况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Interconnection of Renewable Resources, New Opportunity in the Rehabilitation of Old Small Hydropower Plant
In Romania, before 1990, numerous small hydroelectric power plants - SHP were realized for the electrification of isolated areas or small communities. Since 2007, a new concept concerning the operational parameters and yields has been implemented, and the functional SHPs have been re-evaluated. A massive environmental data monitoring campaign has started, creating an economically appropriate SHP database that can be associated with another renewable resource. This paper presents such a pilot station, the first realized in Romania near the Arges River, SHP Budeasa, interconnected with a wind power plant. Some local conditions and part of the realized database are briefly presented. Due to the increase in local demand for electricity, it was necessary to rehabilitate this SHP by associating it with 2 other power plants based on renewable sources. Each component of the pilot station is analyzed separately. After the commissioning of the wind farm an additional production of electricity was obtained, and the pilot station became profitable. From these benefits, the rehabilitation of SHP Budeasa started. The theoretical model, the essential steps in the physical realization and necessary conditions for interconnection are mentioned. The results obtained after seven months of operation and some economic aspects are finally mentioned.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信