Tangguh Ubadari油田全面系统的油藏动态预测流程,为解开资源进展和预测预测提供信心

A. Dewanto
{"title":"Tangguh Ubadari油田全面系统的油藏动态预测流程,为解开资源进展和预测预测提供信心","authors":"A. Dewanto","doi":"10.29118/ipa22-e-47","DOIUrl":null,"url":null,"abstract":"Tangguh Field is located in Bintuni Bay, Papua Barat Province, Indonesia. Tangguh development was commenced following successful exploration program in 1990s. Tangguh has been on production since 2009 through development of 2 LNG trains (Kasim, Titus, Roberts, & Bulling, 2000). Tangguh integrated full field development includes the third LNG train S/U 2023, and development of Ubadari Field and Vorwata EGR/CCUS which Plan of Development (POD) was approved by Government of Indonesia (GoI) in August 2021. Decision to develop Ubadari field is based upon successful drilling of Uba Deep-1 appraisal well in 2018, which supports larger resources in Lower Roabiba reservoir. Ubadari development will be able to mitigate the risk of production shortfall ca 2025 once Tangguh major fields start to decline, as well as to contribute on meeting Indonesia’s growing energy demand. Ubadari development will open opportunity to develop some marginal economic prospects in Western Berau area. The selected development scenario consists of two offshore platforms with five wells, and one export pipeline. Gas from Ubadari Field will be produced directly to Train-3 Onshore Receiving Facilities (ORF) through a new offshore pipeline and tie-in connection to Tangguh fence. To date, there is no production from Ubadari Field, therefore predicting reservoir performance considering subsurface uncertainties is very critical to underpin the development plan. A bp’s proprietary Top Down Reservoir Modelling (TDRMTM) tool-based workflow has been successfully implemented. The workflow considers ranges of reservoir descriptions from limited static data and short Drill Stem Test (DST)/pressure data from exploration/appraisal wells, along with some global analog data, to underpin the evaluation of the system energy, driving mechanism, reservoir connectivity and drainage to predict reservoir performance. The workflow has enabled robust resource progression and development planning, particularly associated with the well count and location, with healthy exploration of subsurface uncertainties.","PeriodicalId":442360,"journal":{"name":"Proceedings of Indonesian Petroleum Association, 46th Annual Convention & Exhibition, 2022","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Comprehensive and Systematic Reservoir Performance Prediction Workflow in Tangguh Ubadari Field, Delivering a Confidence in Unlocking Resource Progression and Prediction Forecast\",\"authors\":\"A. Dewanto\",\"doi\":\"10.29118/ipa22-e-47\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Tangguh Field is located in Bintuni Bay, Papua Barat Province, Indonesia. Tangguh development was commenced following successful exploration program in 1990s. Tangguh has been on production since 2009 through development of 2 LNG trains (Kasim, Titus, Roberts, & Bulling, 2000). Tangguh integrated full field development includes the third LNG train S/U 2023, and development of Ubadari Field and Vorwata EGR/CCUS which Plan of Development (POD) was approved by Government of Indonesia (GoI) in August 2021. Decision to develop Ubadari field is based upon successful drilling of Uba Deep-1 appraisal well in 2018, which supports larger resources in Lower Roabiba reservoir. Ubadari development will be able to mitigate the risk of production shortfall ca 2025 once Tangguh major fields start to decline, as well as to contribute on meeting Indonesia’s growing energy demand. Ubadari development will open opportunity to develop some marginal economic prospects in Western Berau area. The selected development scenario consists of two offshore platforms with five wells, and one export pipeline. Gas from Ubadari Field will be produced directly to Train-3 Onshore Receiving Facilities (ORF) through a new offshore pipeline and tie-in connection to Tangguh fence. To date, there is no production from Ubadari Field, therefore predicting reservoir performance considering subsurface uncertainties is very critical to underpin the development plan. A bp’s proprietary Top Down Reservoir Modelling (TDRMTM) tool-based workflow has been successfully implemented. The workflow considers ranges of reservoir descriptions from limited static data and short Drill Stem Test (DST)/pressure data from exploration/appraisal wells, along with some global analog data, to underpin the evaluation of the system energy, driving mechanism, reservoir connectivity and drainage to predict reservoir performance. The workflow has enabled robust resource progression and development planning, particularly associated with the well count and location, with healthy exploration of subsurface uncertainties.\",\"PeriodicalId\":442360,\"journal\":{\"name\":\"Proceedings of Indonesian Petroleum Association, 46th Annual Convention & Exhibition, 2022\",\"volume\":\"50 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-09-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of Indonesian Petroleum Association, 46th Annual Convention & Exhibition, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29118/ipa22-e-47\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of Indonesian Petroleum Association, 46th Annual Convention & Exhibition, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29118/ipa22-e-47","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Tangguh油田位于印度尼西亚巴布亚巴拉特省Bintuni湾。上世纪90年代勘探成功后,Tangguh油田开始开发。Tangguh自2009年以来一直通过开发2条液化天然气列车(Kasim, Titus, Roberts, & Bulling, 2000年)投入生产。Tangguh综合全油田开发包括第三条液化天然气列车S/U 2023,以及Ubadari油田和Vorwata EGR/CCUS的开发,该开发计划于2021年8月获得印度尼西亚政府(GoI)的批准。开发Ubadari油田的决定是基于2018年成功钻探Uba Deep-1评估井,该评估井支持Lower Roabiba储层的更大资源。一旦Tangguh主要油田在2025年开始减产,Ubadari的开发将能够缓解产量不足的风险,并有助于满足印尼日益增长的能源需求。乌巴达里的开发将为在西贝劳地区开发一些边际经济前景提供机会。选定的开发方案包括两个海上平台,五个井和一个出口管道。Ubadari气田的天然气将通过一条新的海上管道直接输送到Train-3陆上接收设施(ORF),并与Tangguh围栏相连。迄今为止,Ubadari油田没有生产,因此考虑地下不确定性的油藏动态预测对于支持开发计划至关重要。bp专有的基于自顶向下油藏建模(TDRMTM)工具的工作流程已成功实施。该工作流程考虑了来自有限静态数据和来自勘探/评价井的短钻杆测试(DST)/压力数据的油藏描述范围,以及一些全球模拟数据,以支持对系统能量、驱动机制、油藏连通性和排水的评估,从而预测油藏的性能。该工作流程实现了强大的资源进展和开发规划,特别是与井数和井位相关的资源规划,以及对地下不确定性的健康勘探。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Comprehensive and Systematic Reservoir Performance Prediction Workflow in Tangguh Ubadari Field, Delivering a Confidence in Unlocking Resource Progression and Prediction Forecast
Tangguh Field is located in Bintuni Bay, Papua Barat Province, Indonesia. Tangguh development was commenced following successful exploration program in 1990s. Tangguh has been on production since 2009 through development of 2 LNG trains (Kasim, Titus, Roberts, & Bulling, 2000). Tangguh integrated full field development includes the third LNG train S/U 2023, and development of Ubadari Field and Vorwata EGR/CCUS which Plan of Development (POD) was approved by Government of Indonesia (GoI) in August 2021. Decision to develop Ubadari field is based upon successful drilling of Uba Deep-1 appraisal well in 2018, which supports larger resources in Lower Roabiba reservoir. Ubadari development will be able to mitigate the risk of production shortfall ca 2025 once Tangguh major fields start to decline, as well as to contribute on meeting Indonesia’s growing energy demand. Ubadari development will open opportunity to develop some marginal economic prospects in Western Berau area. The selected development scenario consists of two offshore platforms with five wells, and one export pipeline. Gas from Ubadari Field will be produced directly to Train-3 Onshore Receiving Facilities (ORF) through a new offshore pipeline and tie-in connection to Tangguh fence. To date, there is no production from Ubadari Field, therefore predicting reservoir performance considering subsurface uncertainties is very critical to underpin the development plan. A bp’s proprietary Top Down Reservoir Modelling (TDRMTM) tool-based workflow has been successfully implemented. The workflow considers ranges of reservoir descriptions from limited static data and short Drill Stem Test (DST)/pressure data from exploration/appraisal wells, along with some global analog data, to underpin the evaluation of the system energy, driving mechanism, reservoir connectivity and drainage to predict reservoir performance. The workflow has enabled robust resource progression and development planning, particularly associated with the well count and location, with healthy exploration of subsurface uncertainties.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信