{"title":"Kırıkkale Hasan Ali ycel小学建筑加固方法分析","authors":"Mays Raheem Hendı Shujai̇ri̇, H. Çağlar","doi":"10.51764/smutgd.1248530","DOIUrl":null,"url":null,"abstract":"In this study, the building reinforcement provided for Hasan Ali Yücel Elementary School located at Kırıkkale province has been analyzed. The aim is to examine the current status of the school and the work carried out, and to minimize the impact on the architecture of the building and the users. As a result of the study, it has been seen that cast-in-place curtain wall application has been selected for the reinforcement of the school. The building has 4 cast-in-place curtain wall applications, 2 30x200 and 2 30x400 cm. The application has been repeated on all floors in the same number and in the same place. Furthermore, wet floors and corridors, floor coverings, ceiling and wall paints have been renewed.","PeriodicalId":219683,"journal":{"name":"Sürdürülebilir Mühendislik Uygulamaları ve Teknolojik Gelişmeler Dergisi","volume":"71 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis Of Building Reinforcement Method For Hasan Ali Yücel Elementary School In Kırıkkale\",\"authors\":\"Mays Raheem Hendı Shujai̇ri̇, H. Çağlar\",\"doi\":\"10.51764/smutgd.1248530\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this study, the building reinforcement provided for Hasan Ali Yücel Elementary School located at Kırıkkale province has been analyzed. The aim is to examine the current status of the school and the work carried out, and to minimize the impact on the architecture of the building and the users. As a result of the study, it has been seen that cast-in-place curtain wall application has been selected for the reinforcement of the school. The building has 4 cast-in-place curtain wall applications, 2 30x200 and 2 30x400 cm. The application has been repeated on all floors in the same number and in the same place. Furthermore, wet floors and corridors, floor coverings, ceiling and wall paints have been renewed.\",\"PeriodicalId\":219683,\"journal\":{\"name\":\"Sürdürülebilir Mühendislik Uygulamaları ve Teknolojik Gelişmeler Dergisi\",\"volume\":\"71 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Sürdürülebilir Mühendislik Uygulamaları ve Teknolojik Gelişmeler Dergisi\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.51764/smutgd.1248530\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sürdürülebilir Mühendislik Uygulamaları ve Teknolojik Gelişmeler Dergisi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51764/smutgd.1248530","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
在本研究中,对位于Kırıkkale省的Hasan Ali ycel小学的建筑加固进行了分析。目的是检查学校的现状和所进行的工作,并尽量减少对建筑结构和用户的影响。研究结果表明,选择了现浇幕墙应用来加固学校。该建筑有4个现浇幕墙应用,230x200和230x400厘米。该应用程序在相同数量和相同位置的所有楼层重复使用。此外,湿地板和走廊、地板覆盖物、天花板和墙壁油漆已重新粉刷。
Analysis Of Building Reinforcement Method For Hasan Ali Yücel Elementary School In Kırıkkale
In this study, the building reinforcement provided for Hasan Ali Yücel Elementary School located at Kırıkkale province has been analyzed. The aim is to examine the current status of the school and the work carried out, and to minimize the impact on the architecture of the building and the users. As a result of the study, it has been seen that cast-in-place curtain wall application has been selected for the reinforcement of the school. The building has 4 cast-in-place curtain wall applications, 2 30x200 and 2 30x400 cm. The application has been repeated on all floors in the same number and in the same place. Furthermore, wet floors and corridors, floor coverings, ceiling and wall paints have been renewed.