风电多阶段规划投资指标研究

J. Valinejad, M. Marzband, K. Busawon, J. Kyyrä, E. Pouresmaeil
{"title":"风电多阶段规划投资指标研究","authors":"J. Valinejad, M. Marzband, K. Busawon, J. Kyyrä, E. Pouresmaeil","doi":"10.1109/EFEA.2018.8617106","DOIUrl":null,"url":null,"abstract":"This paper presents a Multi-stage stochastic bi-level model for the expansion planning of Wind resources in power systems at a multi-stage horizon. In this paper, the power system consists of a combination of fossil fuel technologies and Wind resources for investment. Demand is characterized by a certain number of demand blocks. The uncertainty of demand for each this block (for each time period of the curve) is determined by the scenario. Afterwards, the suggested model is converted to a mathematical programming with some equilibrium constraints. Following that, after linearization, a mixed integer linear program is obtained. This framework is examined on the IEEE RTS 24-bus network. The obtained simulation results confirm that this model can be appropriately used as a means to analyze the behavior of investments in wind and thermal units.","PeriodicalId":447143,"journal":{"name":"2018 5th International Symposium on Environment-Friendly Energies and Applications (EFEA)","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Investigating Wind Generation Investment Indices in Multi-Stage Planning\",\"authors\":\"J. Valinejad, M. Marzband, K. Busawon, J. Kyyrä, E. Pouresmaeil\",\"doi\":\"10.1109/EFEA.2018.8617106\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a Multi-stage stochastic bi-level model for the expansion planning of Wind resources in power systems at a multi-stage horizon. In this paper, the power system consists of a combination of fossil fuel technologies and Wind resources for investment. Demand is characterized by a certain number of demand blocks. The uncertainty of demand for each this block (for each time period of the curve) is determined by the scenario. Afterwards, the suggested model is converted to a mathematical programming with some equilibrium constraints. Following that, after linearization, a mixed integer linear program is obtained. This framework is examined on the IEEE RTS 24-bus network. The obtained simulation results confirm that this model can be appropriately used as a means to analyze the behavior of investments in wind and thermal units.\",\"PeriodicalId\":447143,\"journal\":{\"name\":\"2018 5th International Symposium on Environment-Friendly Energies and Applications (EFEA)\",\"volume\":\"22 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 5th International Symposium on Environment-Friendly Energies and Applications (EFEA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EFEA.2018.8617106\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 5th International Symposium on Environment-Friendly Energies and Applications (EFEA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EFEA.2018.8617106","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

本文提出了一个多阶段随机双水平模型,用于多阶段水平下电力系统风电资源的扩展规划。在本文中,电力系统由化石燃料技术和风能资源相结合进行投资。需求以一定数量的需求块为特征。每个区块(曲线的每个时间段)需求的不确定性由场景决定。然后,将该模型转化为具有一定均衡约束的数学规划。然后,经过线性化,得到一个混合整数线性规划。该框架在IEEE RTS 24总线网络上进行了验证。仿真结果表明,该模型可以作为分析风电和热电机组投资行为的合适手段。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Investigating Wind Generation Investment Indices in Multi-Stage Planning
This paper presents a Multi-stage stochastic bi-level model for the expansion planning of Wind resources in power systems at a multi-stage horizon. In this paper, the power system consists of a combination of fossil fuel technologies and Wind resources for investment. Demand is characterized by a certain number of demand blocks. The uncertainty of demand for each this block (for each time period of the curve) is determined by the scenario. Afterwards, the suggested model is converted to a mathematical programming with some equilibrium constraints. Following that, after linearization, a mixed integer linear program is obtained. This framework is examined on the IEEE RTS 24-bus network. The obtained simulation results confirm that this model can be appropriately used as a means to analyze the behavior of investments in wind and thermal units.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信