机场建设项目综合进度信息模型

Guangshe Jia, Xiangdong Xue, L. Cao, Jianguo Chen
{"title":"机场建设项目综合进度信息模型","authors":"Guangshe Jia, Xiangdong Xue, L. Cao, Jianguo Chen","doi":"10.1109/ICIII.2008.180","DOIUrl":null,"url":null,"abstract":"Based on the experience of developing and tracking the construction schedules for three airport projects, this article presents an integrated schedule information model for managing the development and tracking of the total project scheduling. It is a systems engineering approach to plan scheduling for airport construction projects, the methods of developing the total project scheduling include analyzing the total schedule target, and developing of an overall schedule by level, zone and stage. And the methods were to develop an integrated three-dimensional schedule information conceptual model. The methods of tracking the schedule plan include schedule target breakdown, duty assignment, establishment of a schedule information communication platform and schedule information reporting system, and execution of dynamic control. The result is a scientifically rigorous and robust tool for construction management of airport projects. And it becomes an important component of the overall project management for airport headquarters to develop and track schedule plan system.","PeriodicalId":185591,"journal":{"name":"2008 International Conference on Information Management, Innovation Management and Industrial Engineering","volume":"77 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integrated Schedule Information Model for Airport Construction Projects\",\"authors\":\"Guangshe Jia, Xiangdong Xue, L. Cao, Jianguo Chen\",\"doi\":\"10.1109/ICIII.2008.180\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Based on the experience of developing and tracking the construction schedules for three airport projects, this article presents an integrated schedule information model for managing the development and tracking of the total project scheduling. It is a systems engineering approach to plan scheduling for airport construction projects, the methods of developing the total project scheduling include analyzing the total schedule target, and developing of an overall schedule by level, zone and stage. And the methods were to develop an integrated three-dimensional schedule information conceptual model. The methods of tracking the schedule plan include schedule target breakdown, duty assignment, establishment of a schedule information communication platform and schedule information reporting system, and execution of dynamic control. The result is a scientifically rigorous and robust tool for construction management of airport projects. And it becomes an important component of the overall project management for airport headquarters to develop and track schedule plan system.\",\"PeriodicalId\":185591,\"journal\":{\"name\":\"2008 International Conference on Information Management, Innovation Management and Industrial Engineering\",\"volume\":\"77 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-12-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 International Conference on Information Management, Innovation Management and Industrial Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICIII.2008.180\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 International Conference on Information Management, Innovation Management and Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIII.2008.180","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文根据三个机场项目建设进度的制定与跟踪的经验,提出了一个综合进度信息模型,用于管理项目总进度的制定与跟踪。机场建设项目计划调度是一种系统工程方法,制定项目总进度计划的方法包括总进度目标分析和按层次、分区、阶段编制总进度计划。建立了一个完整的三维调度信息概念模型。进度计划跟踪的方法包括进度目标分解、任务分配、建立进度信息交流平台和进度信息上报系统、实施动态控制等。为机场工程建设管理提供了科学、严谨、可靠的工具。制定和跟踪机场总部的进度计划系统成为机场总部整体项目管理的重要组成部分。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integrated Schedule Information Model for Airport Construction Projects
Based on the experience of developing and tracking the construction schedules for three airport projects, this article presents an integrated schedule information model for managing the development and tracking of the total project scheduling. It is a systems engineering approach to plan scheduling for airport construction projects, the methods of developing the total project scheduling include analyzing the total schedule target, and developing of an overall schedule by level, zone and stage. And the methods were to develop an integrated three-dimensional schedule information conceptual model. The methods of tracking the schedule plan include schedule target breakdown, duty assignment, establishment of a schedule information communication platform and schedule information reporting system, and execution of dynamic control. The result is a scientifically rigorous and robust tool for construction management of airport projects. And it becomes an important component of the overall project management for airport headquarters to develop and track schedule plan system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信