泰国某联排别墅建设项目施工规划优化模型

S. Doungpan
{"title":"泰国某联排别墅建设项目施工规划优化模型","authors":"S. Doungpan","doi":"10.1109/AEIS53850.2021.00016","DOIUrl":null,"url":null,"abstract":"This paper presents an optimization technique for the construction planning phase; using it, project managers can solve construction project problems before beginning a project. It uses a mathematical model called integer programming in which the decision variable is an integer. In this case study, a total of 190 townhouse projects have been designed by the decision maker using three methods: the conventional system, the load bearing structure precast system, and the skeleton frame system. Our study found that when applying the optimization technique during the construction planning phase, the objective function for the project’s minimum construction cost was 359.171 million Baht (${\\$}11.22$ million), within a total project duration of 55 months. In addition, this paper presents a sensitivity analysis followed by conclusions.","PeriodicalId":208650,"journal":{"name":"2021 International Conference on Advanced Enterprise Information System (AEIS)","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Optimization Model for Construction Planning in a Townhouse Construction Project in Thailand\",\"authors\":\"S. Doungpan\",\"doi\":\"10.1109/AEIS53850.2021.00016\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an optimization technique for the construction planning phase; using it, project managers can solve construction project problems before beginning a project. It uses a mathematical model called integer programming in which the decision variable is an integer. In this case study, a total of 190 townhouse projects have been designed by the decision maker using three methods: the conventional system, the load bearing structure precast system, and the skeleton frame system. Our study found that when applying the optimization technique during the construction planning phase, the objective function for the project’s minimum construction cost was 359.171 million Baht (${\\\\$}11.22$ million), within a total project duration of 55 months. In addition, this paper presents a sensitivity analysis followed by conclusions.\",\"PeriodicalId\":208650,\"journal\":{\"name\":\"2021 International Conference on Advanced Enterprise Information System (AEIS)\",\"volume\":\"40 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 International Conference on Advanced Enterprise Information System (AEIS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AEIS53850.2021.00016\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 International Conference on Advanced Enterprise Information System (AEIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AEIS53850.2021.00016","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

提出了一种施工规划阶段的优化技术;使用它,项目经理可以在项目开始之前解决建设项目问题。它使用一种称为整数规划的数学模型,其中决策变量是一个整数。在这个案例研究中,决策者使用三种方法设计了总共190个联排别墅项目:常规系统、承重结构预制系统和骨架框架系统。我们的研究发现,当在施工规划阶段应用优化技术时,项目在55个月的总工期内,最低建设成本的目标函数为359171万泰铢(${\$}1122万美元)。此外,本文还进行了敏感性分析,得出结论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An Optimization Model for Construction Planning in a Townhouse Construction Project in Thailand
This paper presents an optimization technique for the construction planning phase; using it, project managers can solve construction project problems before beginning a project. It uses a mathematical model called integer programming in which the decision variable is an integer. In this case study, a total of 190 townhouse projects have been designed by the decision maker using three methods: the conventional system, the load bearing structure precast system, and the skeleton frame system. Our study found that when applying the optimization technique during the construction planning phase, the objective function for the project’s minimum construction cost was 359.171 million Baht (${\$}11.22$ million), within a total project duration of 55 months. In addition, this paper presents a sensitivity analysis followed by conclusions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信