{"title":"西部电力走廊项目——横跨南部非洲的大规模水力发电和输电规划","authors":"P. Naidoo, B.M. Mbuere, G. Kelesitse, J. Ventura, M. Musanda","doi":"10.1109/PESAFR.2005.1611776","DOIUrl":null,"url":null,"abstract":"The Westcor project is intended to exploit the environmentally friendly, renewable, hydroelectric energy of the Inga rapids site in the Democratic Republic of Congo (DRC). First pass studies show that HVAC is inadequate and that conventional HVDC at 500 kV is acceptable for low loads over the long distance. For higher loads, it will be required to increase the operating voltage. First pass studies show that 3 GW could be transmitted over the 4000 km long distance at an operating voltage of 800 kV. For the present day, the engineering focus is on conducting the pre feasibility studies, the feasibility studies and preparing the project for financial closure. The customers for the energy off take are the participating utilities and the tariff would largely be determined by the overall capital costs","PeriodicalId":270664,"journal":{"name":"2005 IEEE Power Engineering Society Inaugural Conference and Exposition in Africa","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"The western power corridor project - the planning for large scale hydro electric power generation and transmission across Southern Africa\",\"authors\":\"P. Naidoo, B.M. Mbuere, G. Kelesitse, J. Ventura, M. Musanda\",\"doi\":\"10.1109/PESAFR.2005.1611776\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Westcor project is intended to exploit the environmentally friendly, renewable, hydroelectric energy of the Inga rapids site in the Democratic Republic of Congo (DRC). First pass studies show that HVAC is inadequate and that conventional HVDC at 500 kV is acceptable for low loads over the long distance. For higher loads, it will be required to increase the operating voltage. First pass studies show that 3 GW could be transmitted over the 4000 km long distance at an operating voltage of 800 kV. For the present day, the engineering focus is on conducting the pre feasibility studies, the feasibility studies and preparing the project for financial closure. The customers for the energy off take are the participating utilities and the tariff would largely be determined by the overall capital costs\",\"PeriodicalId\":270664,\"journal\":{\"name\":\"2005 IEEE Power Engineering Society Inaugural Conference and Exposition in Africa\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-07-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2005 IEEE Power Engineering Society Inaugural Conference and Exposition in Africa\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PESAFR.2005.1611776\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005 IEEE Power Engineering Society Inaugural Conference and Exposition in Africa","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESAFR.2005.1611776","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The western power corridor project - the planning for large scale hydro electric power generation and transmission across Southern Africa
The Westcor project is intended to exploit the environmentally friendly, renewable, hydroelectric energy of the Inga rapids site in the Democratic Republic of Congo (DRC). First pass studies show that HVAC is inadequate and that conventional HVDC at 500 kV is acceptable for low loads over the long distance. For higher loads, it will be required to increase the operating voltage. First pass studies show that 3 GW could be transmitted over the 4000 km long distance at an operating voltage of 800 kV. For the present day, the engineering focus is on conducting the pre feasibility studies, the feasibility studies and preparing the project for financial closure. The customers for the energy off take are the participating utilities and the tariff would largely be determined by the overall capital costs