{"title":"企业资源计划系统库存管理模块的评价(以案例研究为例)","authors":"Jordi Nugra, Mahendra Wiyarta, Yohannes Kurniawan","doi":"10.1145/3230348.3230359","DOIUrl":null,"url":null,"abstract":"Inventory management system in manufacturing company is very susceptible to problems. Meanwhile, the system of inventory in xyz company has been running for more than 10 years, never been evaluate. The purpose of the evaluation is to make sure that all of the function in the system are used properly and meets user expectation, especially to enhance the productivity and also efficiency of the company. Methods used in this research are Fit / Gap Analysis method that have function to list the user requirement and check the functionality of the system based on the business process in the company, whether it's already fit or still have gap between the functionality of the system and the business process of the company. Another methodology used is Risk Analysis, Risk Analysis made after gap in the system has been found, risk analysis has function to identify risks that may occur if the company not implement the recommendation that has been given. The result of this analysis will be using to enhance the company both effectiveness and efficiency to increase the value of the company in the future.","PeriodicalId":188878,"journal":{"name":"Proceedings of the 2018 1st International Conference on Internet and e-Business","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The Evaluation of Inventory Management Module of Enterprise Resource Planning System (A Case Study Approach)\",\"authors\":\"Jordi Nugra, Mahendra Wiyarta, Yohannes Kurniawan\",\"doi\":\"10.1145/3230348.3230359\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Inventory management system in manufacturing company is very susceptible to problems. Meanwhile, the system of inventory in xyz company has been running for more than 10 years, never been evaluate. The purpose of the evaluation is to make sure that all of the function in the system are used properly and meets user expectation, especially to enhance the productivity and also efficiency of the company. Methods used in this research are Fit / Gap Analysis method that have function to list the user requirement and check the functionality of the system based on the business process in the company, whether it's already fit or still have gap between the functionality of the system and the business process of the company. Another methodology used is Risk Analysis, Risk Analysis made after gap in the system has been found, risk analysis has function to identify risks that may occur if the company not implement the recommendation that has been given. The result of this analysis will be using to enhance the company both effectiveness and efficiency to increase the value of the company in the future.\",\"PeriodicalId\":188878,\"journal\":{\"name\":\"Proceedings of the 2018 1st International Conference on Internet and e-Business\",\"volume\":\"35 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-04-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 2018 1st International Conference on Internet and e-Business\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3230348.3230359\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2018 1st International Conference on Internet and e-Business","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3230348.3230359","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
摘要
制造企业的库存管理系统非常容易出现问题。同时,xyz公司的库存系统已经运行了10多年,从未进行过评估。评估的目的是确保系统中的所有功能都被正确使用并满足用户的期望,特别是提高公司的生产力和效率。本研究使用的方法是Fit / Gap Analysis方法,其功能是根据公司的业务流程列出用户需求并检查系统的功能,系统的功能与公司的业务流程是否已经匹配或仍然存在差距。使用的另一种方法是风险分析,风险分析是在发现系统中的差距后进行的,风险分析的功能是识别如果公司不执行所给出的建议可能发生的风险。这一分析的结果将用于提高公司的有效性和效率,以增加公司在未来的价值。
The Evaluation of Inventory Management Module of Enterprise Resource Planning System (A Case Study Approach)
Inventory management system in manufacturing company is very susceptible to problems. Meanwhile, the system of inventory in xyz company has been running for more than 10 years, never been evaluate. The purpose of the evaluation is to make sure that all of the function in the system are used properly and meets user expectation, especially to enhance the productivity and also efficiency of the company. Methods used in this research are Fit / Gap Analysis method that have function to list the user requirement and check the functionality of the system based on the business process in the company, whether it's already fit or still have gap between the functionality of the system and the business process of the company. Another methodology used is Risk Analysis, Risk Analysis made after gap in the system has been found, risk analysis has function to identify risks that may occur if the company not implement the recommendation that has been given. The result of this analysis will be using to enhance the company both effectiveness and efficiency to increase the value of the company in the future.