使用选定的kpi改进生产系统的可靠性

W. Biały
{"title":"使用选定的kpi改进生产系统的可靠性","authors":"W. Biały","doi":"10.2478/cqpi-2020-0023","DOIUrl":null,"url":null,"abstract":"Abstract Machine failures in each production system cause an increase in costs and delays in order execution. Therefore, companies decide to introduce solutions that detect and immediately remove worrying symptoms before more serious consequences occur. Unfortunately, not all failures can be avoided – in such cases, the most important thing is the quick reaction of machine operators, maintenance and production managers. This paper identifies reliability indicators and presents the steps and effects of implementing selected KPIs (Key Performance Indicators), which aim at the production process. For the machines in which a failure occurred in the surveyed period, technical availability, Mean Times Between Failures (MTBF), Mean Down Time (MDT), technical object readiness, and the downtime coefficient were calculated.","PeriodicalId":166707,"journal":{"name":"Conference Quality Production Improvement – CQPI","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Improvement of Production System Reliability Using Selected KPIs\",\"authors\":\"W. Biały\",\"doi\":\"10.2478/cqpi-2020-0023\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Machine failures in each production system cause an increase in costs and delays in order execution. Therefore, companies decide to introduce solutions that detect and immediately remove worrying symptoms before more serious consequences occur. Unfortunately, not all failures can be avoided – in such cases, the most important thing is the quick reaction of machine operators, maintenance and production managers. This paper identifies reliability indicators and presents the steps and effects of implementing selected KPIs (Key Performance Indicators), which aim at the production process. For the machines in which a failure occurred in the surveyed period, technical availability, Mean Times Between Failures (MTBF), Mean Down Time (MDT), technical object readiness, and the downtime coefficient were calculated.\",\"PeriodicalId\":166707,\"journal\":{\"name\":\"Conference Quality Production Improvement – CQPI\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Quality Production Improvement – CQPI\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/cqpi-2020-0023\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Quality Production Improvement – CQPI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/cqpi-2020-0023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

每个生产系统中的机器故障都会导致成本的增加和订单执行的延迟。因此,公司决定引入解决方案,在更严重的后果发生之前发现并立即消除令人担忧的症状。不幸的是,并不是所有的故障都可以避免——在这种情况下,最重要的是机器操作员、维护人员和生产经理的快速反应。本文确定了可靠性指标,并提出了实施选定的kpi(关键绩效指标)的步骤和效果,这些指标针对生产过程。对于在调查期间发生故障的机器,计算了技术可用性、平均故障间隔时间(MTBF)、平均停机时间(MDT)、技术对象准备情况和停机系数。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Improvement of Production System Reliability Using Selected KPIs
Abstract Machine failures in each production system cause an increase in costs and delays in order execution. Therefore, companies decide to introduce solutions that detect and immediately remove worrying symptoms before more serious consequences occur. Unfortunately, not all failures can be avoided – in such cases, the most important thing is the quick reaction of machine operators, maintenance and production managers. This paper identifies reliability indicators and presents the steps and effects of implementing selected KPIs (Key Performance Indicators), which aim at the production process. For the machines in which a failure occurred in the surveyed period, technical availability, Mean Times Between Failures (MTBF), Mean Down Time (MDT), technical object readiness, and the downtime coefficient were calculated.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信