{"title":"Iskustva u izvođenju i eksploataciji fotonaponske elektrane instalisane snage 500 kW u fabrici „Gruner“ d.o.o-Vlasotince","authors":"M. Vuković, Željko V. Despotović, B. Simonović","doi":"10.46793/eee22-4.57v","DOIUrl":null,"url":null,"abstract":"The main purpose of the solar photovoltaic power plant (SPVPP), with installed power of 500 kW on the roof of the factory GRUNER Serbian Ltd in Vlasotince, is to electrical supply of consumers in the factory. Considering the geometric dimensions of the roof and the daily and monthly profiles of electricity consumption in the factory, at the beginning of 2021, SPVPP was designed. In this way It is achieves parallel operation with the electricity distribution network, with the possibility of delivering surplus electrical energy. SPVPP was performed by the company CONSEKO Ltd., Belgrade in the period 15.0715.10.2021 and was put into trial operation at the end of September 2021, and the use permit of the plant for operation was issued on 30.12.2021. Since that date, SPVPP has been officially in exploitation operation. The GRUNER factory is on March 30, 2022 concluded with JP EPS, Branch \"EPS Snabdevanje\" concluded a contract for full supply of electricity for the period 01.04.2022 to 31.12.2023. The paper presents some key experiences from the construction and operation of PVPP, which could be interesting for both designers and implementers. The realization of PVPP has made a certain contribution to the promotion of renewable energy sources and the use of \"green\" energy in the territory of the Republic of Serbia.","PeriodicalId":236996,"journal":{"name":"Energija, ekonomija, ekologija","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energija, ekonomija, ekologija","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46793/eee22-4.57v","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

太阳能光伏电站(SPVPP)的主要目的是为工厂内的消费者供电,该电站安装在弗拉索蒂诺斯(Vlasotince)的GRUNER塞尔维亚有限公司的屋顶上,装机功率为500千瓦。考虑到屋顶的几何尺寸以及工厂每天和每月的用电量分布,在2021年初,SPVPP被设计出来。这样就实现了与配电网的并联运行,有了输送多余电能的可能。SPVPP由贝尔格莱德CONSEKO有限公司于2021年10月15日至15日运营,并于2021年9月底试运行,并于2021年12月30日颁发了工厂运营使用许可证。自该日起,SPVPP正式进入开发作业。格鲁纳工厂于2022年3月30日与JP EPS,分公司“EPS Snabdevanje”签订了2022年4月1日至2023年12月31日的全部电力供应合同。本文介绍了PVPP建设和运行中的一些重要经验,可供设计人员和实施者参考。PVPP的实现为塞尔维亚共和国境内可再生能源的推广和“绿色”能源的使用做出了一定的贡献。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Iskustva u izvođenju i eksploataciji fotonaponske elektrane instalisane snage 500 kW u fabrici „Gruner“ d.o.o-Vlasotince
The main purpose of the solar photovoltaic power plant (SPVPP), with installed power of 500 kW on the roof of the factory GRUNER Serbian Ltd in Vlasotince, is to electrical supply of consumers in the factory. Considering the geometric dimensions of the roof and the daily and monthly profiles of electricity consumption in the factory, at the beginning of 2021, SPVPP was designed. In this way It is achieves parallel operation with the electricity distribution network, with the possibility of delivering surplus electrical energy. SPVPP was performed by the company CONSEKO Ltd., Belgrade in the period 15.0715.10.2021 and was put into trial operation at the end of September 2021, and the use permit of the plant for operation was issued on 30.12.2021. Since that date, SPVPP has been officially in exploitation operation. The GRUNER factory is on March 30, 2022 concluded with JP EPS, Branch "EPS Snabdevanje" concluded a contract for full supply of electricity for the period 01.04.2022 to 31.12.2023. The paper presents some key experiences from the construction and operation of PVPP, which could be interesting for both designers and implementers. The realization of PVPP has made a certain contribution to the promotion of renewable energy sources and the use of "green" energy in the territory of the Republic of Serbia.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信