{"title":"具有使用新型平台安装DVR/sup TM/的现场经验","authors":"N. Woodley, A. Sundaram, T. Holden, T. Einarson","doi":"10.1109/ICPST.2000.898161","DOIUrl":null,"url":null,"abstract":"Installation of the world's first platform-mounted dynamic voltage restorer (DVR/sup TM/ PM) prototype on a major North American utility system to protect a critical customer load from power system voltage disturbances ushers in a new era of power quality solutions available for overhead distribution systems on the utility side of the revenue billing meter. The DVR/sup TM/ PM built by Siemens for the Electric Power Research Institute (EPRI) was installed at the Northern Lights Community College in Dawson Creek, B.C. where it provides protection for 600 kVA of load from disturbances coming from the utility 25 kV distribution system that serves the college. The early success of the DVR/sup TM/ PM demonstration in Canada has implications for the Australian market where in excess of 90% of the 11 and 22 kV networks are bare conductor overhead lines. As a consequence, customers are exposed to the voltage sags that the DVR/sup TM/ is designed to mitigate. Smaller critical customer loads can now be offered improved power quality network solutions on the 11 or 22 kV distribution systems that were not previously available. In Victoria alone, there are approximately 14,000 customers (or groups of commercial/industrial customers) who would benefit from such a network solution. This paper describes the DVR/sup TM/ PM and the demonstration project installation, commissioning, and field operation to date. Future equipment designs are also discussed.","PeriodicalId":330989,"journal":{"name":"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"34","resultStr":"{\"title\":\"Field experience with the new platform-mounted DVR/sup TM/\",\"authors\":\"N. Woodley, A. Sundaram, T. Holden, T. Einarson\",\"doi\":\"10.1109/ICPST.2000.898161\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Installation of the world's first platform-mounted dynamic voltage restorer (DVR/sup TM/ PM) prototype on a major North American utility system to protect a critical customer load from power system voltage disturbances ushers in a new era of power quality solutions available for overhead distribution systems on the utility side of the revenue billing meter. The DVR/sup TM/ PM built by Siemens for the Electric Power Research Institute (EPRI) was installed at the Northern Lights Community College in Dawson Creek, B.C. where it provides protection for 600 kVA of load from disturbances coming from the utility 25 kV distribution system that serves the college. The early success of the DVR/sup TM/ PM demonstration in Canada has implications for the Australian market where in excess of 90% of the 11 and 22 kV networks are bare conductor overhead lines. As a consequence, customers are exposed to the voltage sags that the DVR/sup TM/ is designed to mitigate. Smaller critical customer loads can now be offered improved power quality network solutions on the 11 or 22 kV distribution systems that were not previously available. In Victoria alone, there are approximately 14,000 customers (or groups of commercial/industrial customers) who would benefit from such a network solution. This paper describes the DVR/sup TM/ PM and the demonstration project installation, commissioning, and field operation to date. Future equipment designs are also discussed.\",\"PeriodicalId\":330989,\"journal\":{\"name\":\"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)\",\"volume\":\"39 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-12-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"34\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPST.2000.898161\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPST.2000.898161","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 34

摘要

全球首个平台式动态电压恢复器(DVR/sup TM/ PM)样机在北美主要公用事业系统上安装,以保护关键客户负载免受电力系统电压干扰,为公用事业端收入计费仪表的架空配电系统带来了电能质量解决方案的新时代。西门子为电力研究所(EPRI)建造的DVR/sup TM/ PM安装在不列颠哥伦比亚省道森溪的北极光社区学院,在那里它为600千伏安的负载提供保护,免受来自为学院服务的公用事业25千伏配电系统的干扰。加拿大DVR/sup TM/ PM演示的早期成功对澳大利亚市场产生了影响,其中超过90%的11和22千伏网络是裸导体架空线路。因此,客户将暴露在DVR/sup TM/旨在缓解的电压下降中。较小的关键客户负载现在可以在11或22千伏配电系统上提供改进的电能质量网络解决方案,这在以前是不可用的。仅在维多利亚州,就有大约14,000名客户(或商业/工业客户群体)将从这种网络解决方案中受益。介绍了迄今为止DVR/sup TM/ PM及示范工程的安装、调试和现场运行情况。对未来设备的设计也进行了讨论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Field experience with the new platform-mounted DVR/sup TM/
Installation of the world's first platform-mounted dynamic voltage restorer (DVR/sup TM/ PM) prototype on a major North American utility system to protect a critical customer load from power system voltage disturbances ushers in a new era of power quality solutions available for overhead distribution systems on the utility side of the revenue billing meter. The DVR/sup TM/ PM built by Siemens for the Electric Power Research Institute (EPRI) was installed at the Northern Lights Community College in Dawson Creek, B.C. where it provides protection for 600 kVA of load from disturbances coming from the utility 25 kV distribution system that serves the college. The early success of the DVR/sup TM/ PM demonstration in Canada has implications for the Australian market where in excess of 90% of the 11 and 22 kV networks are bare conductor overhead lines. As a consequence, customers are exposed to the voltage sags that the DVR/sup TM/ is designed to mitigate. Smaller critical customer loads can now be offered improved power quality network solutions on the 11 or 22 kV distribution systems that were not previously available. In Victoria alone, there are approximately 14,000 customers (or groups of commercial/industrial customers) who would benefit from such a network solution. This paper describes the DVR/sup TM/ PM and the demonstration project installation, commissioning, and field operation to date. Future equipment designs are also discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信