{"title":"大型能源电力传输技术分析","authors":"He Dayu","doi":"10.1109/TENCON.1993.320653","DOIUrl":null,"url":null,"abstract":"The authors present and discuss the possible alternatives of future bulk power transmissions to meet the Chinese state policy of \"Transmitting Power from West to East\" with a synthetical consideration both of large transmitting power from the giant energy resources and the new technical progress in the next century, taking Southwest hydropower resources as an example.<<ETX>>","PeriodicalId":110496,"journal":{"name":"Proceedings of TENCON '93. IEEE Region 10 International Conference on Computers, Communications and Automation","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An analysis for power transmission technology from large energy resources\",\"authors\":\"He Dayu\",\"doi\":\"10.1109/TENCON.1993.320653\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The authors present and discuss the possible alternatives of future bulk power transmissions to meet the Chinese state policy of \\\"Transmitting Power from West to East\\\" with a synthetical consideration both of large transmitting power from the giant energy resources and the new technical progress in the next century, taking Southwest hydropower resources as an example.<<ETX>>\",\"PeriodicalId\":110496,\"journal\":{\"name\":\"Proceedings of TENCON '93. IEEE Region 10 International Conference on Computers, Communications and Automation\",\"volume\":\"42 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1993-10-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of TENCON '93. IEEE Region 10 International Conference on Computers, Communications and Automation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TENCON.1993.320653\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of TENCON '93. IEEE Region 10 International Conference on Computers, Communications and Automation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TENCON.1993.320653","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
An analysis for power transmission technology from large energy resources
The authors present and discuss the possible alternatives of future bulk power transmissions to meet the Chinese state policy of "Transmitting Power from West to East" with a synthetical consideration both of large transmitting power from the giant energy resources and the new technical progress in the next century, taking Southwest hydropower resources as an example.<>