A. Arriola, Isaac Gongora, J. Canseco, Marco Antonio Alamilla
{"title":"在墨西哥Tabasco部署海上EMCS系统,为技术更先进、更全面的自动化解决方案奠定了基础","authors":"A. Arriola, Isaac Gongora, J. Canseco, Marco Antonio Alamilla","doi":"10.1109/PCICON.2015.7435104","DOIUrl":null,"url":null,"abstract":"This paper discusses the design and deployment of an Energy Management and Control System (EMCS) for the monitoring and control of MV switchgear, motor control centers (MCCs), and low voltage (LV) loads on an exploration company's offshore oil site. This paper also reviews constraints faced during EMCS design, which took place in conjunction with a local Engineering, Procurement, and Construction (EPC) company, and the exploration company, the project's customer. Finally, we show how the EMCS design prepared the customer for the future deployment of a SCADA HMI, fast load shedding, load restoration, and load sharing operational across the site's multiple production centers and platforms - the customer's ultimate goal.","PeriodicalId":191070,"journal":{"name":"2015 IEEE Petroleum and Chemical Industry Committee Conference (PCIC)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The deployment of an offshore EMCS system in Tabasco, Mexico — Preparing the grounds for a more technologically advanced and comprehensive automation solution\",\"authors\":\"A. Arriola, Isaac Gongora, J. Canseco, Marco Antonio Alamilla\",\"doi\":\"10.1109/PCICON.2015.7435104\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper discusses the design and deployment of an Energy Management and Control System (EMCS) for the monitoring and control of MV switchgear, motor control centers (MCCs), and low voltage (LV) loads on an exploration company's offshore oil site. This paper also reviews constraints faced during EMCS design, which took place in conjunction with a local Engineering, Procurement, and Construction (EPC) company, and the exploration company, the project's customer. Finally, we show how the EMCS design prepared the customer for the future deployment of a SCADA HMI, fast load shedding, load restoration, and load sharing operational across the site's multiple production centers and platforms - the customer's ultimate goal.\",\"PeriodicalId\":191070,\"journal\":{\"name\":\"2015 IEEE Petroleum and Chemical Industry Committee Conference (PCIC)\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 IEEE Petroleum and Chemical Industry Committee Conference (PCIC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PCICON.2015.7435104\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE Petroleum and Chemical Industry Committee Conference (PCIC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCICON.2015.7435104","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The deployment of an offshore EMCS system in Tabasco, Mexico — Preparing the grounds for a more technologically advanced and comprehensive automation solution
This paper discusses the design and deployment of an Energy Management and Control System (EMCS) for the monitoring and control of MV switchgear, motor control centers (MCCs), and low voltage (LV) loads on an exploration company's offshore oil site. This paper also reviews constraints faced during EMCS design, which took place in conjunction with a local Engineering, Procurement, and Construction (EPC) company, and the exploration company, the project's customer. Finally, we show how the EMCS design prepared the customer for the future deployment of a SCADA HMI, fast load shedding, load restoration, and load sharing operational across the site's multiple production centers and platforms - the customer's ultimate goal.