设计基于精益生产管理的金属加工企业减少未完成订单模型

Gino Apaza-Casabona, Stive Bacilio-Peve, C. León-Chavarri, E. Ramos-Palomino
{"title":"设计基于精益生产管理的金属加工企业减少未完成订单模型","authors":"Gino Apaza-Casabona, Stive Bacilio-Peve, C. León-Chavarri, E. Ramos-Palomino","doi":"10.1109/ICIM56520.2022.00031","DOIUrl":null,"url":null,"abstract":"In recent years, the metalworking industry has become a very important link in the Peruvian economy. However, this industry often faces challenges such as low productivity rates and lack of information for operators. Within this context, this study assessed a small metalworking company currently experiencing losses derived from late order penalties. Hence, the implementation of a Production Management model based on Lean Kanban, SMED, Poka- Yoke, Report A3, the 5S and VSM is proposed herein, seeking to optimize methods, organize workstations, and improve purchasing and Production Management, thus considerably reducing waste in the organization. Furthermore, through the implementation of this model, an increase in order fulfillment and productivity rates is expected, as well as a reduction in Cycle and Setup times.","PeriodicalId":391964,"journal":{"name":"2022 8th International Conference on Information Management (ICIM)","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Designing a Lean-based Production Management Model to Reduce Non-fulfilled Orders at a Metalworking Company\",\"authors\":\"Gino Apaza-Casabona, Stive Bacilio-Peve, C. León-Chavarri, E. Ramos-Palomino\",\"doi\":\"10.1109/ICIM56520.2022.00031\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In recent years, the metalworking industry has become a very important link in the Peruvian economy. However, this industry often faces challenges such as low productivity rates and lack of information for operators. Within this context, this study assessed a small metalworking company currently experiencing losses derived from late order penalties. Hence, the implementation of a Production Management model based on Lean Kanban, SMED, Poka- Yoke, Report A3, the 5S and VSM is proposed herein, seeking to optimize methods, organize workstations, and improve purchasing and Production Management, thus considerably reducing waste in the organization. Furthermore, through the implementation of this model, an increase in order fulfillment and productivity rates is expected, as well as a reduction in Cycle and Setup times.\",\"PeriodicalId\":391964,\"journal\":{\"name\":\"2022 8th International Conference on Information Management (ICIM)\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 8th International Conference on Information Management (ICIM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICIM56520.2022.00031\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 8th International Conference on Information Management (ICIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIM56520.2022.00031","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

近年来,金属加工业已成为秘鲁经济中非常重要的一环。然而,该行业经常面临诸如生产率低和运营商缺乏信息等挑战。在此背景下,本研究评估了一家小型金属加工公司目前因延迟订单罚款而遭受损失。因此,本文提出了基于精益看板、SMED、Poka- Yoke、Report A3、5S和VSM的生产管理模型的实施,旨在优化方法、组织工作站、改善采购和生产管理,从而大大减少组织中的浪费。此外,通过该模型的实施,预计订单履行和生产率的提高,以及周期和安装时间的缩短。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Designing a Lean-based Production Management Model to Reduce Non-fulfilled Orders at a Metalworking Company
In recent years, the metalworking industry has become a very important link in the Peruvian economy. However, this industry often faces challenges such as low productivity rates and lack of information for operators. Within this context, this study assessed a small metalworking company currently experiencing losses derived from late order penalties. Hence, the implementation of a Production Management model based on Lean Kanban, SMED, Poka- Yoke, Report A3, the 5S and VSM is proposed herein, seeking to optimize methods, organize workstations, and improve purchasing and Production Management, thus considerably reducing waste in the organization. Furthermore, through the implementation of this model, an increase in order fulfillment and productivity rates is expected, as well as a reduction in Cycle and Setup times.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信