灵活的ASIC CIM系统(Orchard II)

K. Wada, T. Okubo, T. Takeda, C. Hashimoto
{"title":"灵活的ASIC CIM系统(Orchard II)","authors":"K. Wada, T. Okubo, T. Takeda, C. Hashimoto","doi":"10.1109/IEMT.1992.639870","DOIUrl":null,"url":null,"abstract":"A flexible CIM system for ASIC manufacturing called ORCHARD I1 has been developed, that offers enhanced flexibility of system construction and production line management. It includes modules that handle scheduling, lot tracking, equipment control, data collection and database management. Each module is implemented on distributed workstations to conserve CPU resources. Non-SECS as well as SECS equipment can be easily connected to the system using a ”virtual machine” method. A database schema is automatically generated after designing a data display screen, Collected data are converted into data groups that meet the specific needs of equipment engineers, process engineers, and production line managers based on a ”data processing recipe.” Flexible production line management is achieved using a novel scheduling technology that features a priority evaluation function. With these technologies, even a lowvolume production line can be set up cost-effectively.","PeriodicalId":403090,"journal":{"name":"Thirteenth IEEE/CHMT International Electronics Manufacturing Technology Symposium","volume":"94 2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-09-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"A Flexible ASIC CIM System (Orchard II)\",\"authors\":\"K. Wada, T. Okubo, T. Takeda, C. Hashimoto\",\"doi\":\"10.1109/IEMT.1992.639870\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A flexible CIM system for ASIC manufacturing called ORCHARD I1 has been developed, that offers enhanced flexibility of system construction and production line management. It includes modules that handle scheduling, lot tracking, equipment control, data collection and database management. Each module is implemented on distributed workstations to conserve CPU resources. Non-SECS as well as SECS equipment can be easily connected to the system using a ”virtual machine” method. A database schema is automatically generated after designing a data display screen, Collected data are converted into data groups that meet the specific needs of equipment engineers, process engineers, and production line managers based on a ”data processing recipe.” Flexible production line management is achieved using a novel scheduling technology that features a priority evaluation function. With these technologies, even a lowvolume production line can be set up cost-effectively.\",\"PeriodicalId\":403090,\"journal\":{\"name\":\"Thirteenth IEEE/CHMT International Electronics Manufacturing Technology Symposium\",\"volume\":\"94 2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1992-09-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Thirteenth IEEE/CHMT International Electronics Manufacturing Technology Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEMT.1992.639870\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Thirteenth IEEE/CHMT International Electronics Manufacturing Technology Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMT.1992.639870","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

开发了一种用于ASIC制造的柔性CIM系统ORCHARD 1,该系统提供了增强的系统构建和生产线管理的灵活性。它包括处理调度、批次跟踪、设备控制、数据收集和数据库管理的模块。每个模块都在分布式工作站上实现,以节省CPU资源。非SECS以及SECS设备都可以使用“虚拟机”方法轻松连接到系统。设计完数据显示屏幕后自动生成数据库模式,根据“数据处理配方”将收集到的数据转换成满足设备工程师、流程工程师和生产线管理人员特定需求的数据组。采用具有优先级评价功能的新型调度技术实现柔性生产线管理。有了这些技术,即使是小批量的生产线也可以经济有效地建立起来。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Flexible ASIC CIM System (Orchard II)
A flexible CIM system for ASIC manufacturing called ORCHARD I1 has been developed, that offers enhanced flexibility of system construction and production line management. It includes modules that handle scheduling, lot tracking, equipment control, data collection and database management. Each module is implemented on distributed workstations to conserve CPU resources. Non-SECS as well as SECS equipment can be easily connected to the system using a ”virtual machine” method. A database schema is automatically generated after designing a data display screen, Collected data are converted into data groups that meet the specific needs of equipment engineers, process engineers, and production line managers based on a ”data processing recipe.” Flexible production line management is achieved using a novel scheduling technology that features a priority evaluation function. With these technologies, even a lowvolume production line can be set up cost-effectively.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信