{"title":"军事设施项目变更顺序因子分析研究","authors":"W. Jung, Min-jae Lee","doi":"10.6106/KJCEM.2016.17.2.127","DOIUrl":null,"url":null,"abstract":"Abstract : Design modification is one of the elements that must be controlled in the process of any construction project. Especially a military facility project comes with more obstacles than private work due to the unique characteristics and closeness of the military. As there are both the project manager and the user within the ordering body, it is likely to have difficulties unless communication is conducted smoothly. The reason is that such issues regarding communication lead to design modification and it will result in the user's dissatisfaction. Thus this study aimed to identify the elements that generally cause design modification by analyzing characteristics of military projects from the status of current project contracts, analyzing past elements that lead to design modification and comprehensively researching responds from the survey on operators of facility projects. It is expected that loss from design modification of military facility projects is reduced by proposing feasible and practical improvements.","PeriodicalId":220018,"journal":{"name":"Korean Journal of Construction Engineering and Management","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A Study on Change order factor analysis for military facility projects\",\"authors\":\"W. Jung, Min-jae Lee\",\"doi\":\"10.6106/KJCEM.2016.17.2.127\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract : Design modification is one of the elements that must be controlled in the process of any construction project. Especially a military facility project comes with more obstacles than private work due to the unique characteristics and closeness of the military. As there are both the project manager and the user within the ordering body, it is likely to have difficulties unless communication is conducted smoothly. The reason is that such issues regarding communication lead to design modification and it will result in the user's dissatisfaction. Thus this study aimed to identify the elements that generally cause design modification by analyzing characteristics of military projects from the status of current project contracts, analyzing past elements that lead to design modification and comprehensively researching responds from the survey on operators of facility projects. It is expected that loss from design modification of military facility projects is reduced by proposing feasible and practical improvements.\",\"PeriodicalId\":220018,\"journal\":{\"name\":\"Korean Journal of Construction Engineering and Management\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-03-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Korean Journal of Construction Engineering and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.6106/KJCEM.2016.17.2.127\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Korean Journal of Construction Engineering and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.6106/KJCEM.2016.17.2.127","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

摘要:设计变更是任何建设项目实施过程中必须控制的要素之一。特别是军事设施工程,由于军队的特殊性和亲近性,比民间工程的障碍更大。由于订购主体中既有项目经理,也有用户,如果沟通不顺畅,很可能会出现困难。原因是这些关于沟通的问题会导致设计的修改,从而导致用户的不满意。因此,本研究旨在通过从当前项目合同的现状分析军事项目的特点,分析过去导致设计修改的因素,并综合研究对设施项目运营商的调查反应,找出普遍导致设计修改的因素。预期通过提出可行和实际的改进,可以减少军事设施项目设计修改的损失。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Study on Change order factor analysis for military facility projects
Abstract : Design modification is one of the elements that must be controlled in the process of any construction project. Especially a military facility project comes with more obstacles than private work due to the unique characteristics and closeness of the military. As there are both the project manager and the user within the ordering body, it is likely to have difficulties unless communication is conducted smoothly. The reason is that such issues regarding communication lead to design modification and it will result in the user's dissatisfaction. Thus this study aimed to identify the elements that generally cause design modification by analyzing characteristics of military projects from the status of current project contracts, analyzing past elements that lead to design modification and comprehensively researching responds from the survey on operators of facility projects. It is expected that loss from design modification of military facility projects is reduced by proposing feasible and practical improvements.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信