{"title":"电力招标项目承包商评价体系的概念模型","authors":"Alprianto Zainuddin, Andri D. Setiawan, A. Hidayatno","doi":"10.1145/3468013.3468641","DOIUrl":null,"url":null,"abstract":"The selection of an EPC Contractor in Procurement for Indonesia's electricity system faces several challenges, especially for strategic projects such as transmission and substations. The procurement of goods/services in the electricity sector considers several evaluation criteria such as technical experience, administrative requirements, prices, and how the provider has met the applicable provisions in Indonesia. This research aimed to design a conceptual model to determine the EPC Tender Process Criteria for Electricity Construction by using an experimental design approach to measure the value of the 4 (four) main criteria used in the evaluation and actual implementation of EPC contractors. This conceptual model included stakeholders involved as executors of tenders or policy-makers directly related to achieving organizational goals. The data processing method used the Multicriteria decision-making method (MCDM) such as the Analytic Network Process (ANP) and the Promethee Method.","PeriodicalId":129225,"journal":{"name":"Proceedings of the 4th Asia Pacific Conference on Research in Industrial and Systems Engineering","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Conceptual Model for Contractor Assessment System in the Electricity Project with Tender\",\"authors\":\"Alprianto Zainuddin, Andri D. Setiawan, A. Hidayatno\",\"doi\":\"10.1145/3468013.3468641\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The selection of an EPC Contractor in Procurement for Indonesia's electricity system faces several challenges, especially for strategic projects such as transmission and substations. The procurement of goods/services in the electricity sector considers several evaluation criteria such as technical experience, administrative requirements, prices, and how the provider has met the applicable provisions in Indonesia. This research aimed to design a conceptual model to determine the EPC Tender Process Criteria for Electricity Construction by using an experimental design approach to measure the value of the 4 (four) main criteria used in the evaluation and actual implementation of EPC contractors. This conceptual model included stakeholders involved as executors of tenders or policy-makers directly related to achieving organizational goals. The data processing method used the Multicriteria decision-making method (MCDM) such as the Analytic Network Process (ANP) and the Promethee Method.\",\"PeriodicalId\":129225,\"journal\":{\"name\":\"Proceedings of the 4th Asia Pacific Conference on Research in Industrial and Systems Engineering\",\"volume\":\"19 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-05-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 4th Asia Pacific Conference on Research in Industrial and Systems Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3468013.3468641\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 4th Asia Pacific Conference on Research in Industrial and Systems Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3468013.3468641","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A Conceptual Model for Contractor Assessment System in the Electricity Project with Tender
The selection of an EPC Contractor in Procurement for Indonesia's electricity system faces several challenges, especially for strategic projects such as transmission and substations. The procurement of goods/services in the electricity sector considers several evaluation criteria such as technical experience, administrative requirements, prices, and how the provider has met the applicable provisions in Indonesia. This research aimed to design a conceptual model to determine the EPC Tender Process Criteria for Electricity Construction by using an experimental design approach to measure the value of the 4 (four) main criteria used in the evaluation and actual implementation of EPC contractors. This conceptual model included stakeholders involved as executors of tenders or policy-makers directly related to achieving organizational goals. The data processing method used the Multicriteria decision-making method (MCDM) such as the Analytic Network Process (ANP) and the Promethee Method.