布局后ope预测冗余线插入时钟倾斜最小化

Jin-Tai Yan, Zhi-Wei Chen
{"title":"布局后ope预测冗余线插入时钟倾斜最小化","authors":"Jin-Tai Yan, Zhi-Wei Chen","doi":"10.1109/ICCD.2012.6378695","DOIUrl":null,"url":null,"abstract":"Based on the equilibrium concept of inserting load in a physical balance, the insertion of redundant wires can be used to minimize the clock skew in an OPE-predicted clock tree. For five tested benchmarks, the experimental results show that our proposed algorithm only increases 2.8% of the total load on the average for the insertion of OPE-predicted redundant wires and decreases 30.85 ps of the clock skew on the average to obtain the near zero-skew result in reasonable CPU time.","PeriodicalId":313428,"journal":{"name":"2012 IEEE 30th International Conference on Computer Design (ICCD)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2012-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Post-layout OPE-predicted redundant wire insertion for clock skew minimization\",\"authors\":\"Jin-Tai Yan, Zhi-Wei Chen\",\"doi\":\"10.1109/ICCD.2012.6378695\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Based on the equilibrium concept of inserting load in a physical balance, the insertion of redundant wires can be used to minimize the clock skew in an OPE-predicted clock tree. For five tested benchmarks, the experimental results show that our proposed algorithm only increases 2.8% of the total load on the average for the insertion of OPE-predicted redundant wires and decreases 30.85 ps of the clock skew on the average to obtain the near zero-skew result in reasonable CPU time.\",\"PeriodicalId\":313428,\"journal\":{\"name\":\"2012 IEEE 30th International Conference on Computer Design (ICCD)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 IEEE 30th International Conference on Computer Design (ICCD)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCD.2012.6378695\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 IEEE 30th International Conference on Computer Design (ICCD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCD.2012.6378695","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

基于在物理平衡中插入负载的平衡概念,冗余导线的插入可用于最小化ope预测时钟树中的时钟倾斜。在5个测试的基准测试中,实验结果表明,我们提出的算法在合理的CPU时间内,平均只增加了总负载的2.8%,平均减少了30.85 ps的时钟倾斜,以获得接近零倾斜的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Post-layout OPE-predicted redundant wire insertion for clock skew minimization
Based on the equilibrium concept of inserting load in a physical balance, the insertion of redundant wires can be used to minimize the clock skew in an OPE-predicted clock tree. For five tested benchmarks, the experimental results show that our proposed algorithm only increases 2.8% of the total load on the average for the insertion of OPE-predicted redundant wires and decreases 30.85 ps of the clock skew on the average to obtain the near zero-skew result in reasonable CPU time.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信